ITAC Assessment: AM0003
ITAC logo
ITAC Assessment: AM0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SAFETY JOINTS & VALVES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,334 1,723,036
kWh
Natural Gas $10,146 2,074
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $867

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $7,269 $12,000 $7,269
-
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $3,130 - - $3,130
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $1,580 $255 $1,580
40,445
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,838 - $1,838
46,893
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $495 - $495
8,206
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $785 $2,932 $785
12,896
kWh
-
07 2.2437: Recover waste heat from equipment $822 $500 - $822
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $82 $37 $82
1,465
kWh
-
TOTAL RECOMMENDED $16,001 $15,724 $12,049
109,905
kWh
$3,952
-
MMBtu
TOTAL IMPLEMENTED $867 $2,969 $867
14,361
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs