Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

301

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2504 #07 Y:2025 Use solar heat to make electricty $223,326 $1,974,272
UC2504 #06 Y:2025 Keep doors and windows shut when not on use $8,677 -
UC2504 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,212 $2,686
UC2504 #04 Y:2025 Install timers and/or thermostats $21,015 $1,166
UC2504 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,622 $1,600
UC2504 #02 Y:2025 Use / purchase optimum sized compressor $33,264 $60
UC2504 #01 Y:2025 Utilize controls to operate equipment only when needed $19,657 $60
MA0787 #05 Y:2017 Turn off equipment during breaks, reduce operating time $660 $100
MA0787 #04 Y:2017 Turn off equipment during breaks, reduce operating time $4,111 $100
MA0787 #03 Y:2017 Turn off equipment during breaks, reduce operating time $4,796 $100
MA0787 #02 Y:2017 Turn off equipment during breaks, reduce operating time $6,589 $100
MA0787 #01 Y:2017 Use solar heat for heat $76,722 $790,840
MA0748 #07 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $721 $2,245
MA0748 #06 Y:2015 Lower temperature during the winter season and vice-versa $1,168 $500
MA0748 #05 Y:2015 Turn off equipment when not in use $1,137 $100
MA0748 #04 Y:2015 Install occupancy sensors $1,687 $5,365
MA0748 #03 Y:2015 Recover waste heat from equipment $4,530 $9,000
MA0748 #02 Y:2015 Use waste heat from hot flue gases to preheat $9,716 $9,850
MA0748 #01 Y:2015 Insulate bare equipment $35,959 $11,580
MA0746 #07 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $1,874 $2,960