4,864
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0328 #13 Y:2025 | 13 | 2025 | Turn off equipment during breaks, reduce operating time | $306 | $50 |
n/a
|
TT0328 #12 Y:2025 | 12 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,117 | $1,990 |
n/a
|
TT0328 #11 Y:2025 | 11 | 2025 | Use insulation in furnaces to facilitate heating / cooling | $1,157 | $299 |
n/a
|
TT0328 #10 Y:2025 | 10 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,292 | $50 |
n/a
|
TT0328 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $5,237 | $50 |
n/a
|
TT0328 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $13,275 | $56,250 |
n/a
|
TT0328 #07 Y:2025 | 07 | 2025 | Use waste heat from hot flue gases to preheat | $25,908 | $60,000 |
n/a
|
TT0328 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $41,721 | $631,361 |
n/a
|
TT0328 #05 Y:2025 | 05 | 2025 | Replace city water with recycled water via cooling tower | $52,760 | $41,250 |
n/a
|
TT0328 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $81,754 | $144,000 |
n/a
|
TT0328 #03 Y:2025 | 03 | 2025 | Insulate bare equipment | $92,553 | $200,000 |
n/a
|
TT0328 #02 Y:2025 | 02 | 2025 | Adopt in-house material generation | $184,128 | $600,000 |
n/a
|
TT0328 #01 Y:2025 | 01 | 2025 | Reduce or eliminate waste | $296,352 | $1,200,000 |
n/a
|
TT0333 #08 Y:2025 | 08 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $596 | $1,186 |
n/a
|
TT0333 #07 Y:2025 | 07 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $1,569 | $3,000 |
n/a
|
TT0333 #06 Y:2025 | 06 | 2025 | Replace high resistance ducts, pipes, and fittings | $3,915 | $1,640 |
n/a
|
TT0333 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $3,400 | $21,000 |
n/a
|
TT0333 #04 Y:2025 | 04 | 2025 | Turn off equipment when not in use | $3,979 | $900 |
n/a
|
TT0333 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $7,881 | $94 |
n/a
|
TT0333 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $39,658 | $1,500 |
n/a
|