Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,944

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0339 #09 Y:2025 Reduce space conditioning during non-working hours $868 $100
TT0339 #08 Y:2025 Utilize energy-efficient belts and other improved mechanisms $6,566 $850
TT0339 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $11,575 $11,250
TT0339 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $15,876 $5,625
TT0339 #05 Y:2025 Turn off equipment during breaks, reduce operating time $22,030 $20,000
TT0339 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $24,795 $10,920
TT0339 #03 Y:2025 Optimize plant power factor $31,076 $9,750
TT0339 #02 Y:2025 Begin a practice of predictive / preventative maintenance $33,333 $35,000
TT0339 #01 Y:2025 Use solar heat for heat $49,796 $276,634
TT0336 #12 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $153 $255
TT0336 #11 Y:2025 Install occupancy sensors $355 $1,600
TT0336 #10 Y:2025 Utilize controls to operate equipment only when needed $507 $100
TT0336 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $551 $375
TT0336 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $572 $60
TT0336 #07 Y:2025 Eliminate or reduce compressed air usage $1,078 $400
TT0336 #06 Y:2025 Utilize controls to operate equipment only when needed $1,830 $500
TT0336 #05 Y:2025 Optimize plant power factor $2,201 $5,250
TT0336 #04 Y:2025 Burn a less expensive grade of fuel $6,724 $40,000
TT0336 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $13,640 $6,680
TT0336 #02 Y:2025 Use battery storage for demand control $19,703 $159,000