Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

630

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0453 #05 Y:2024 Install occupancy sensors $4,117 $1,690
MI0453 #04 Y:2024 Use most efficient type of electric motors $8,976 $11,882
MI0453 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $14,219 $14,799
MI0453 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,805 $1,620
MI0453 #01 Y:2024 Use distillation, evaporation to remove contaminants $43,981 $80,000
MI0451 #07 Y:2024 Insulate bare equipment $529 $949
MI0451 #06 Y:2024 Change rate schedules or other changes in utility service $1,231 $100
MI0451 #05 Y:2024 Install occupancy sensors $2,513 $1,755
MI0451 #04 Y:2024 Optimize plant power factor $4,130 $4,044
MI0451 #03 Y:2024 Install vinyl strip / high speed / air curtain doors $8,251 $10,833
MI0451 #02 Y:2024 Turn off equipment when not in use $9,582 $40
MI0451 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $10,862 $16,333
MI0450 #06 Y:2024 Lower temperature during the winter season and vice-versa $53 -
MI0450 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,894 $80
MI0450 #04 Y:2024 Replace electrically-operated equipment with fossil fuel equipment $2,036 $240
MI0450 #03 Y:2024 Optimize plant power factor $7,120 $17,650
MI0450 #02 Y:2024 Use most efficient type of electric motors $16,369 $4,496
MI0450 #01 Y:2024 Change rate schedules or other changes in utility service $43,159 $3,200
MI0445 #08 Y:2024 Install occupancy sensors $3,269 $2,860
MI0445 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,583 $5,793