Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,656

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0586 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $9,340 $49,500
LE0586 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,427 $35,960
LE0586 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,379 $2,500
LE0586 #02 Y:2024 Install timers and/or thermostats $17,326 $1,600
LE0586 #01 Y:2024 Install occupancy sensors $1,582 $70
LE0585 #07 Y:2024 Replace existing hvac unit with high efficiency model $3,754 $33,002
LE0585 #06 Y:2024 Use solar heat to heat water $132,239 $658,000
LE0585 #05 Y:2024 Eliminate or reduce compressed air usage $11,641 $25,639
LE0585 #04 Y:2024 Install / repair insulation on condensate lines $11,387 $25,000
LE0585 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,395 $660
LE0585 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,317 $2,200
LE0585 #01 Y:2024 Install timers and/or thermostats $27,784 -
LE0584 #08 Y:2024 Preheat combustion air with waste heat $8,045 $30,000
LE0584 #07 Y:2024 Clean or color roof to reduce solar load $9,000 $31,500
LE0584 #06 Y:2024 Analyze flue gas for proper air/fuel ratio $1,853 $5,000
LE0584 #05 Y:2024 Install back-up equipment $148,846 $350,000
LE0584 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,377 $2,400
LE0584 #03 Y:2024 Install timers and/or thermostats $1,504 $600
LE0584 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,030 $100
LE0584 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $1,871 -