Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,540

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0123 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $697 $443
NL0123 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,523 $9,000
NL0123 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $23,122 $24,804
NL0123 #03 Y:2025 Optimize plant power factor $206,052 $550,650
NL0123 #02 Y:2025 Upgrade conveyors $229,830 $214,000
NL0123 #01 Y:2025 Eliminate a by-product $821,100 $590,100
NL0122 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $931 $90
NL0122 #06 Y:2025 Change rate schedules or other changes in utility service $1,242 $120
NL0122 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,650 $12,200
NL0122 #04 Y:2025 Turn off equipment when not in use $5,864 $120
NL0122 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,944 $13,202
NL0122 #02 Y:2025 Optimize plant power factor $10,000 $15,600
NL0122 #01 Y:2025 Use waste heat from hot flue gases to preheat $58,962 $417,000
NL0120 #06 Y:2025 Use photocell controls $52 $76
NL0120 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $185 $240
NL0120 #04 Y:2025 Use proper thickness of insulation on building envelope $432 $2,440
NL0120 #03 Y:2025 Use demand controller or load shedder $1,312 $960
NL0120 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,394 $5,536
NL0120 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,056 $9,000
NL0119 #05 Y:2025 Minimize boiler blowdown with better feedwater treatment $555 $3,479