Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,551

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0128 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,832 $3,600
NL0128 #05 Y:2026 Use optimum temperature $12,756 $40,000
NL0128 #04 Y:2026 Air condition only space necessary $13,467 $7,019
NL0128 #03 Y:2026 Meter waste water $18,726 $15,000
NL0128 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $41,428 $20,000
NL0128 #01 Y:2026 Apply a protective coating to racks and tanks $103,072 $2,040
NL0124 #05 Y:2025 Install compressor air intakes in coolest locations $1,720 $4,170
NL0124 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,696 $1,000
NL0124 #03 Y:2025 Install occupancy sensors $5,075 $11,340
NL0124 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $10,061 $11,590
NL0124 #01 Y:2025 Upgrade obsolete equipment $150,000 $875,540
NL0123 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $697 $443
NL0123 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,523 $9,000
NL0123 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $23,122 $24,804
NL0123 #03 Y:2025 Optimize plant power factor $206,052 $550,650
NL0123 #02 Y:2025 Upgrade conveyors $229,830 $214,000
NL0123 #01 Y:2025 Eliminate a by-product $821,100 $590,100
NL0122 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $931 $90
NL0122 #06 Y:2025 Change rate schedules or other changes in utility service $1,242 $120
NL0122 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,650 $12,200