Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,999

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2507 #06 Y:2025 Apply for tax-free status for energy purchases $18,635 $50
UC2507 #05 Y:2025 Insulate bare equipment $1,482 $2,236
UC2507 #04 Y:2025 Install timers and/or thermostats $2,335 $6,240
UC2507 #03 Y:2025 Use solar heat to make electricty $19,935 $129,193
UC2507 #02 Y:2025 Optimize plant power factor $3,899 $12,217
UC2507 #01 Y:2025 Replace existing hvac unit with high efficiency model $8,064 $112,141
UC2417 #06 Y:2024 Lower temperature during the winter season and vice-versa $1,329 -
UC2417 #05 Y:2024 Insulate bare equipment $5,554 $1,050
UC2417 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,301 $75
UC2417 #03 Y:2024 Replace existing hvac unit with high efficiency model $1,989 $7,146
UC2417 #02 Y:2024 Optimize plant power factor $2,644 $9,173
UC2417 #01 Y:2024 Pay utility bills on time $888 -
SU0564 #08 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $1,605 $12,000
SU0564 #07 Y:2024 Install occupancy sensors $124 $723
SU0564 #06 Y:2024 Install back-up equipment $32,534 $169,100
SU0564 #05 Y:2024 Install compressor air intakes in coolest locations $4,420 $332
SU0564 #04 Y:2024 Recover waste heat from equipment $3,312 $118
SU0564 #03 Y:2024 Eliminate or reduce compressed air usage $3,941 -
SU0564 #02 Y:2024 Pay bills on time to avoid late fees $1,442 -
SU0564 #01 Y:2024 Disconnect ballasts $103 -