Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,660

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2607 #04 Y:2026 Eliminate old stock and modify inventory control $18,250 $25,000
LS2607 #03 Y:2026 Install sub-metering equipment $8,629 $4,500
LS2607 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $248 $50
LS2607 #01 Y:2026 Increase amount of waste recovered for resale $32,800 -
LT8448 #05 Y:2026 Use solar heat to make electricty $556,491 $7,323,896
LT8448 #04 Y:2026 Install vinyl strip / high speed / air curtain doors $23,347 $12,442
LT8448 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,744 $7,251
LT8448 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,180 -
LT8448 #01 Y:2026 Modify refrigeration system to operate at a lower pressure $59,448 $219,165
LS2606 #04 Y:2026 Use or replace with energy efficient substitutes $35,573 $285,000
LS2606 #03 Y:2026 Install occupancy sensors $386 $765
LS2606 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,072 $13,213
LS2606 #01 Y:2026 Install sub-metering equipment $6,150 $2,500
LT8447 #05 Y:2026 Lower temperature during the winter season and vice-versa $2,922 -
LT8447 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $13,079 $31,131
LT8447 #03 Y:2026 Install occupancy sensors $3,854 $1,039
LT8447 #02 Y:2026 Modify workload $142,452 $76,494
LT8447 #01 Y:2026 Turn off equipment when not in use $3,158 $1,147
LS0626 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,518 $2,295
LS0626 #03 Y:2026 Install occupancy sensors $1,624 $875