Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,717

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0217 #04 Y:2025 Install occupancy sensors $10,073 $3,780
IP0217 #03 Y:2025 Use optimum temperature $18,398 -
IP0217 #02 Y:2025 Eliminate or reduce compressed air usage $46,665 -
IP0217 #01 Y:2025 Use computer programs to optimize hvac performance $49,158 -
UL2513 #06 Y:2025 Install occupancy sensors $602 $2,234
UL2513 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,723 $561
UL2513 #04 Y:2025 Use solar heat to make electricty $57,929 $431,966
UL2513 #03 Y:2025 Use outside cold water source as a supply of cooling water $34,574 $58,425
UL2513 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,535 $1,080
UL2513 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,366 -
IP0216 #04 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $14,853 $8,928
IP0216 #03 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,912 $969
IP0216 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $238 $118
IP0216 #01 Y:2025 Eliminate or reduce compressed air usage $4,771 -
IP0215 #11 Y:2025 Use proper thickness of insulation on building envelope $1,206 $2,279
IP0215 #10 Y:2025 Optimize plant power factor $26,556 $45,576
IP0215 #09 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $10,982 $16,152
IP0215 #08 Y:2025 Install compressor air intakes in coolest locations $5,523 $960
IP0215 #07 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $58,146 $9,960