Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0627 #12 Y:2024 Install wind powered electric generator $364,913 $212,152
SF0627 #11 Y:2024 Reduce excessive boiler blowdown $758 $3,995
SF0627 #10 Y:2024 Heat water with exhaust heat $23,270 $67,410
SF0627 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $6,796 $17,995
SF0627 #08 Y:2024 Insulate feedwater tank $31,296 $45,008
SF0627 #07 Y:2024 Utilize a less expensive cooling method $56,762 $75,338
SF0627 #06 Y:2024 Insulate bare equipment $772 $338
SF0627 #05 Y:2024 Insulate bare equipment $828 $98
SF0627 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,465 $650
SF0627 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $4,552 $140
SF0627 #02 Y:2024 Repair and eliminate steam leaks $2,331 -
SF0627 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $7,292 -
SJ0027 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,837 $1,550
SJ0027 #03 Y:2024 Turn off equipment when not in use $3,400 -
SJ0027 #02 Y:2024 Install vinyl strip / high speed / air curtain doors $32,211 $22,296
SJ0027 #01 Y:2024 Use solar heat to make electricty $89,704 $333,155
SJ0026 #10 Y:2024 Recover heat from exhausted steam, hot air or hot water $706 $1,151
SJ0026 #09 Y:2024 Reduce excessive boiler blowdown $2,261 $1,017
SJ0026 #08 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $4,132 $25,650
SJ0026 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $400 -