Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,424

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0609 #05 Y:2025 Install occupancy sensors $1,142 $4,125
AS0609 #04 Y:2025 Clean or color roof to reduce solar load $3,521 $34,268
AS0609 #03 Y:2025 Increase efficiency of trucks $6,674 $4,249
AS0609 #02 Y:2025 Use computer programs to optimize hvac performance $8,783 $627
AS0609 #01 Y:2025 Use solar heat to make electricty $21,733 $150,416
AS0610 #07 Y:2025 Install timers and/or thermostats $176 $187
AS0610 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $893 $510
AS0610 #05 Y:2025 Install spectral reflectors / delamp $1,308 $61
AS0610 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,539 $1,975
AS0610 #03 Y:2025 Replace fossil fuel equipment with electrical equipment $1,708 $950
AS0610 #02 Y:2025 Install occupancy sensors $2,279 $2,835
AS0610 #01 Y:2025 Lower ceiling to reduce conditioned space $2,349 $16,000
AS0608 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $1,174 $1,423
AS0608 #05 Y:2025 Conserve energy by efficient use of vending machines $1,407 $489
AS0608 #04 Y:2025 Install timers on light switches in little used areas $1,657 $656
AS0608 #03 Y:2025 Use solar heat to make electricty $80,861 $486,301
AS0608 #02 Y:2025 Replace existing equipment with more suitable substitutes $107,581 $4,250,000
AS0608 #01 Y:2025 Add equipment/ operators to reduce production bottleneck $606,000 $10,786,500
AS0607 #07 Y:2025 Pay bills on time to avoid late fees $23 $39
AS0607 #06 Y:2025 Install timers and/or thermostats $156 $264