Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,223

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0391 #08 Y:1989 Insulate bare equipment $360 $512
TN0391 #07 Y:1989 Utilize higher efficiency lamps and/or ballasts $577 $350
TN0391 #06 Y:1989 Insulate bare equipment $1,421 $263
TN0391 #05 Y:1989 Improve air circulation with destratification fans / other methods $465 $3,000
TN0391 #04 Y:1989 Install compressor air intakes in coolest locations $5,420 $2,780
TN0391 #03 Y:1989 Install vinyl strip / high speed / air curtain doors $1,950 $1,800
TN0391 #02 Y:1989 Utilize energy-efficient belts and other improved mechanisms $13,800 $5,200
TN0391 #01 Y:1989 Eliminate leaks in inert gas and compressed air lines/ valves $15,900 $480
TN0390 #07 Y:1989 Replace electrically-operated equipment with fossil fuel equipment $167,999 $976,000
TN0390 #06 Y:1989 Utilize higher efficiency lamps and/or ballasts $703 $438
TN0390 #05 Y:1989 Keep lamps and reflectors clean $1,983 $5,850
TN0390 #04 Y:1989 Utilize energy-efficient belts and other improved mechanisms $28,121 $12,250
TN0390 #03 Y:1989 Install timers and/or thermostats $11,893 $1,200
TN0390 #02 Y:1989 Install compressor air intakes in coolest locations $39,625 $5,440
TN0390 #01 Y:1989 Improve lubrication practices $44,021 $13,500
RU0079 #06 Y:1989 Use optimum temperature $115,500 -
RU0079 #05 Y:1989 Improve air circulation with destratification fans / other methods $2,725 $8,460
RU0079 #04 Y:1989 Analyze flue gas for proper air/fuel ratio $8,409 $500
RU0079 #03 Y:1989 Turn off equipment during breaks, reduce operating time $11,329 -
RU0079 #02 Y:1989 Eliminate leaks in inert gas and compressed air lines/ valves $4,185 $725