Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,618

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0119 #02 Y:1995 Insulate bare equipment $4,410 $4,925
SD0119 #01 Y:1995 Use most efficient type of electric motors $5,107 $4,150
OR0236 #07 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $8,926 $21,000
OR0236 #06 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $29,389 $85,872
OR0236 #05 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $41,808 $12,925
OR0236 #04 Y:1995 Reduce illumination to minimum necessary levels $6,163 -
OR0236 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $13,053 $12,418
OR0236 #02 Y:1995 Utilize energy-efficient belts and other improved mechanisms $1,388 -
OR0236 #01 Y:1995 Use most efficient type of electric motors $9,371 $35,317
ND0209 #09 Y:1995 Utilize higher efficiency lamps and/or ballasts $151 $520
ND0209 #08 Y:1995 Turn off equipment during breaks, reduce operating time $525 $1,400
ND0209 #07 Y:1995 Install vinyl strip / high speed / air curtain doors $2,157 $3,720
ND0209 #06 Y:1995 Use most efficient type of electric motors $4,749 $7,975
ND0209 #05 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $900 $938
ND0209 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $926 $547
ND0209 #03 Y:1995 Install vinyl strip / high speed / air curtain doors $1,016 $490
ND0209 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $5,079 $1,200
ND0209 #01 Y:1995 Use radiant heater for spot heating $484 -
KG0023 #05 Y:1995 Install occupancy sensors $31 $65
KG0023 #04 Y:1995 Analyze flue gas for proper air/fuel ratio $793 $1,000