Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,639

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KG0025 #03 Y:1995 Insulate bare equipment $20,807 $284
KG0025 #02 Y:1995 Shift from daytime to nighttime operation $21,682 -
KG0025 #01 Y:1995 Use plant owned transformers or lease transformers $28,787 $7,200
UD0461 #06 Y:1995 Use evaporation to concentrate material $14,223 $20,000
UD0461 #05 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $3,483 $1,000
UD0461 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $9,525 $14,640
UD0461 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $2,923 -
UD0461 #02 Y:1995 Reschedule plant operations or reduce load to avoid peaks $4,437 -
UD0461 #01 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $28,758 $45,000
UL0127 #03 Y:1995 Use most efficient type of electric motors $37,934 $59,260
UL0127 #02 Y:1995 Analyze flue gas for proper air/fuel ratio $10,913 $2,000
UL0127 #01 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,455 $40
UM0027 #04 Y:1995 Use waste heat from hot flue gases to preheat incoming fluids $4,636 $1,998
UM0027 #03 Y:1995 Use / purchase optimum sized compressor $1,197 $3,100
UM0027 #02 Y:1995 Utilize higher efficiency lamps and/or ballasts $6,609 $14,020
UM0027 #01 Y:1995 Use most efficient type of electric motors $1,047 $760
TN0563 #13 Y:1995 Lease / purchase baler; sell cardboard to recycler $8,700 $8,480
TN0563 #12 Y:1995 Purchase high materials in returnable bulk containers $11,700 $10,200
TN0563 #11 Y:1995 Make a new by-product $45,294 $100,000
TN0563 #10 Y:1995 Make a new by-product $664,104 $275,000