Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,813

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0623 #08 Y:2024 Replace existing equipment with more suitable substitutes $56,000 $20,720
UF0623 #07 Y:2024 Improve combustion control capability $958 $1,400
UF0623 #05 Y:2024 Turn off equipment when not in use $1,616 -
UF0623 #04 Y:2024 Install de-aerator in place of condensate tank $2,627 $2,343
UF0623 #03 Y:2024 Replace high resistance ducts, pipes, and fittings $4,089 $5,440
UF0623 #02 Y:2024 Preheat combustion air with waste heat $11,057 $4,000
UF0623 #01 Y:2024 Use demand controller or load shedder $21,088 $3,402
UF0622 #12 Y:2024 Modify facility to avoid excess maintenance costs $3,200 $3,200
UF0622 #11 Y:2024 Improve space comfort conditioning $30,240 $788
UF0622 #10 Y:2024 Level one – add communication using iiot devices to existing control system to modify operations $46,005 -
UF0622 #08 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,035 -
UF0622 #07 Y:2024 Minimize condenser cooling water temperature $5,875 $6,148
UF0622 #04 Y:2024 Use most efficient type of electric motors $10,345 $12,420
UF0622 #03 Y:2024 Insulate bare equipment $13,853 $3,888
UF0621 #11 Y:2024 Improve space comfort conditioning $11,856 $4,760
UF0621 #09 Y:2024 Replace existing equipment with more suitable substitutes $15,000 $3,868
UF0621 #08 Y:2024 Develop standard operating procedures $15,000 $700
UF0621 #05 Y:2024 Use most efficient type of electric motors $6,374 $17,850
UF0621 #04 Y:2024 Use demand controller or load shedder $9,670 $4,795
UF0621 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $10,063 $456