ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UF0623 #08 Y:2024 | 08 | 2024 | Replace existing equipment with more suitable substitutes | $56,000 | $20,720 | |
UF0623 #07 Y:2024 | 07 | 2024 | Improve combustion control capability | $958 | $1,400 | |
UF0623 #05 Y:2024 | 05 | 2024 | Turn off equipment when not in use | $1,616 | - | |
UF0623 #04 Y:2024 | 04 | 2024 | Install de-aerator in place of condensate tank | $2,627 | $2,343 | |
UF0623 #03 Y:2024 | 03 | 2024 | Replace high resistance ducts, pipes, and fittings | $4,089 | $5,440 | |
UF0623 #02 Y:2024 | 02 | 2024 | Preheat combustion air with waste heat | $11,057 | $4,000 | |
UF0623 #01 Y:2024 | 01 | 2024 | Use demand controller or load shedder | $21,088 | $3,402 | |
UF0622 #12 Y:2024 | 12 | 2024 | Modify facility to avoid excess maintenance costs | $3,200 | $3,200 | |
UF0622 #11 Y:2024 | 11 | 2024 | Improve space comfort conditioning | $30,240 | $788 | |
UF0622 #10 Y:2024 | 10 | 2024 | Level one – add communication using iiot devices to existing control system to modify operations | $46,005 | - | |
UF0622 #08 Y:2024 | 08 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $5,035 | - | |
UF0622 #07 Y:2024 | 07 | 2024 | Minimize condenser cooling water temperature | $5,875 | $6,148 | |
UF0622 #04 Y:2024 | 04 | 2024 | Use most efficient type of electric motors | $10,345 | $12,420 | |
UF0622 #03 Y:2024 | 03 | 2024 | Insulate bare equipment | $13,853 | $3,888 | |
UF0621 #11 Y:2024 | 11 | 2024 | Improve space comfort conditioning | $11,856 | $4,760 | |
UF0621 #09 Y:2024 | 09 | 2024 | Replace existing equipment with more suitable substitutes | $15,000 | $3,868 | |
UF0621 #08 Y:2024 | 08 | 2024 | Develop standard operating procedures | $15,000 | $700 | |
UF0621 #05 Y:2024 | 05 | 2024 | Use most efficient type of electric motors | $6,374 | $17,850 | |
UF0621 #04 Y:2024 | 04 | 2024 | Use demand controller or load shedder | $9,670 | $4,795 | |
UF0621 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,063 | $456 |