Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,674

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0041 #06 Y:2025 Install occupancy sensors $37,951 $77,070
SJ0041 #03 Y:2025 Turn off equipment when not in use $9,425 -
SJ0041 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,904 -
SJ0041 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,057 -
SJ0036 #06 Y:2025 Reschedule plant operations or reduce load to avoid peaks $39,541 -
SJ0036 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,243 -
SJ0036 #04 Y:2025 Replace existing equipment with more suitable substitutes $13,688 $62,974
SD0676 #11 Y:2025 Install common header on compressors $2,478 $2,050
SD0676 #08 Y:2025 Reschedule plant operations or reduce load to avoid peaks $143,491 -
SD0676 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,805 -
SD0674 #11 Y:2025 Use properly designed and sized hvac equipment $6,377 $44,800
SD0674 #10 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $77 $85
SD0674 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $955 -
SD0674 #03 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $3,362 $5,179
SD0672 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $30,634 -
SD0672 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $5,349 -
SD0672 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $565 $847
SD0671 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $14,911 $23,188
SD0671 #03 Y:2025 Recharge batteries on during off-peak demand periods $3,996 -
SJ0034 #03 Y:2025 Use optimum temperature $3,458 -