Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,566

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0661 #13 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,043 $19,842
SD0661 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $970 $1,863
SD0661 #09 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,243 $7,340
SD0661 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $854 $250
SD0661 #06 Y:2024 Recharge batteries on during off-peak demand periods $2,354 -
SD0661 #05 Y:2024 Recharge batteries on during off-peak demand periods $10,205 -
SD0661 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,348 $676
SD0661 #02 Y:2024 Use battery storage for demand control $1,321,862 $54,390
SD0661 #01 Y:2024 Use solar heat to make electricty $641,754 $589,764
SD0659 #09 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,401 $2,880
SD0659 #08 Y:2024 Reduce the pressure of compressed air to the minimum required $42,562 -
SD0659 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $86,343 $34,702
SJ0021 #08 Y:2024 Lower temperature during the winter season and vice-versa $4,528 -
SJ0021 #05 Y:2024 Install occupancy sensors $1,255 $1,308
SJ0021 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,291 $2,078
SJ0021 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $3,040 -
SJ0021 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $493 $109
SF0620 #04 Y:2024 Upgrade obsolete equipment $11,663 $52,983
SF0620 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $39,113 $24,553
SF0620 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $101,612 $3,840