371
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2417 #06 Y:2024 | 06 | 2024 | Lower temperature during the winter season and vice-versa | $1,329 | - |
n/a
|
UC2417 #05 Y:2024 | 05 | 2024 | Insulate bare equipment | $5,554 | $1,800 |
n/a
|
UC2417 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,301 | $75 |
n/a
|
UC2417 #03 Y:2024 | 03 | 2024 | Replace existing hvac unit with high efficiency model | $1,989 | $7,146 |
n/a
|
UC2417 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $2,644 | $9,173 |
n/a
|
UC2417 #01 Y:2024 | 01 | 2024 | Pay utility bills on time | $888 | - |
n/a
|
UC2416 #10 Y:2024 | 10 | 2024 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $55,311 | $819,496 |
n/a
|
UC2416 #09 Y:2024 | 09 | 2024 | Replace existing hvac unit with high efficiency model | $80,097 | $301,647 |
n/a
|
UC2416 #08 Y:2024 | 08 | 2024 | Replace existing chiller with high efficiency model | $240,811 | $2,527,500 |
n/a
|
UC2416 #07 Y:2024 | 07 | 2024 | Install / repair insulation on steam lines | $294 | $139 |
n/a
|
UC2416 #06 Y:2024 | 06 | 2024 | Insulate bare equipment | $3,536 | $1,750 |
n/a
|
UC2416 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $73,494 | $29,062 |
n/a
|
UC2416 #04 Y:2024 | 04 | 2024 | Install occupancy sensors | $510 | $218 |
n/a
|
UC2416 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,767 | $1,553 |
n/a
|
UC2416 #02 Y:2024 | 02 | 2024 | Recover waste heat from equipment | $159,604 | $5,236 |
n/a
|
UC2416 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,662 | $1,600 |
n/a
|
UC2415 #06 Y:2024 | 06 | 2024 | Reduce the pressure of compressed air to the minimum required | $11,011 | $75 |
n/a
|
UC2415 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $32,064 | $27,307 |
n/a
|
UC2415 #04 Y:2024 | 04 | 2024 | Use battery storage for demand control | $81,652 | $611,715 |
n/a
|
UC2415 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $109,123 | $769,066 |
n/a
|