Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,597

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0479 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $3,667 $6,000
LE0479 #03 Y:2019 Minimize use of outside make-up air for ventilation except when used for economizer cycle $20,437 $22,500
LE0479 #02 Y:2019 Recover waste heat from equipment $9,431 $9,000
LE0479 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $339 $310
WV0581 #09 Y:2019 Utilize energy-efficient belts and other improved mechanisms $938 -
WV0581 #08 Y:2019 Reduce the pressure of compressed air to the minimum required $1,540 $100
WV0581 #07 Y:2019 Develop a repair/replace policy $4,849 $738
WV0581 #06 Y:2019 Recycle white water $8,651 $4,100
WV0581 #05 Y:2019 Upgrade controls on compressors $9,387 $4,000
WV0581 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $17,233 $58,107
WV0581 #03 Y:2019 Use or replace with energy efficient substitutes $28,868 $78,000
WV0581 #02 Y:2019 Avoid cooling of process streams or materials that must subsequently be heated $37,537 $5,500
WV0581 #01 Y:2019 Replace obsolete burners with more efficient ones $128,494 $314,600
NC0634 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $746 $120
NC0634 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $4,566 $850
NC0634 #02 Y:2019 Turn off equipment when not in use $546 $2,500
NC0634 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $13,879 $25,678
MA0805 #08 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $1,775 $200
MA0805 #07 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $14,131 $5,222
MA0805 #06 Y:2019 Meter recycled water (to reduce sewer charges) $25,552 $7,916