Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,564

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0644 #07 Y:2025 Modify storage space to avoid rental of a warehouse $54,000 -
UF0644 #06 Y:2025 Install an uninteruptable power supply $52,901 $24,080
UF0644 #05 Y:2025 Install equipment to move product $138,087 $384,000
UF0644 #04 Y:2025 Use fixtures to reduce machine changeout times $148,800 $220,000
UF0644 #03 Y:2025 Use or replace with energy efficient substitutes $46,082 $37,000
UF0644 #02 Y:2025 Install soft-start to eliminate nuisance trips $1,140 $4,477
UF0644 #01 Y:2025 Use demand controller or load shedder $7,758 $3,728
MZ0392 #10 Y:2025 Reduce space conditioning during non-working hours $19,865 $1,400
MZ0392 #09 Y:2025 Reduce the pressure of compressed air to the minimum required $1,700 $1,000
MZ0392 #08 Y:2025 Turn off equipment during breaks, reduce operating time $462 $530
MZ0392 #07 Y:2025 Replace existing chiller with high efficiency model $20,181 $62,500
MZ0392 #06 Y:2025 Use solar heat to make electricty $89,166 $755,622
MZ0392 #05 Y:2025 Recover waste heat from equipment $3,904 $10,250
MZ0392 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,559 $500
MZ0392 #03 Y:2025 Install occupancy sensors $130 $460
MZ0392 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,123 $9,500
MZ0392 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,718 $9,190
LE0609 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,594 $8,000
LE0609 #06 Y:2025 Use / purchase optimum sized compressor $7,089 $15,050
LE0609 #05 Y:2025 Install soft-start to eliminate nuisance trips $1,627 $2,000