Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,458

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS0426 #04 Y:2026 Replace heat treating oven with more efficient unit $2,523 $10,000
LS0426 #03 Y:2026 Use or replace with energy efficient substitutes $5,327 $15,000
LS0426 #02 Y:2026 Install occupancy sensors $1,732 $625
LS0426 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $11,415 $3,547
LS0326 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,593 $1,439
LS0326 #03 Y:2026 Install occupancy sensors $1,563 $625
LS0326 #02 Y:2026 Reduce heat gain by window tinting $12,072 $2,520
LS0326 #01 Y:2026 Reduce space conditioning during non-working hours $5,549 $175
MUCM35 #14 Y:2026 Install partitions to reduce size of conditioned space $1,858 $6
MUCM35 #13 Y:2026 Install vinyl strip / high speed / air curtain doors $2,294 $7,582
MUCM35 #12 Y:2026 Close holes and openings in building such as broken windows $98 $85
MUCM35 #11 Y:2026 Reduce space conditioning during non-working hours $3,679 $15,464
MUCM35 #10 Y:2026 Lower temperature during the winter season and vice-versa $611 -
MUCM35 #09 Y:2026 Lower temperature during the winter season and vice-versa $4,491 -
MUCM35 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $5,273 $20,577
MUCM35 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $825 $216
MUCM35 #06 Y:2026 Install occupancy sensors $429 $210
MUCM35 #05 Y:2026 Install occupancy sensors $82 $126
MUCM35 #04 Y:2026 Use photocell controls $98 $114
MUCM35 #03 Y:2026 Reduce illumination to minimum necessary levels $52 -