Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

137

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Games, toys, and children's vehicles, except dolls and bicycles
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1021 #11 Y:2020 Make a practice of turning off lights when not needed $249 $240
UD1021 #10 Y:2020 Utilize higher efficiency lamps and/or ballasts $10,902 $7,800
UD1021 #09 Y:2020 Install occupancy sensors $16,106 $2,800
UD1021 #08 Y:2020 Utilize higher efficiency lamps and/or ballasts $24,419 $37,053
UD1021 #07 Y:2020 Size electric motors for peak operating efficiency $8,594 $1,590
UD1021 #06 Y:2020 Install compressor air intakes in coolest locations $4,902 $2,000
UD1021 #05 Y:2020 Reduce the pressure of compressed air to the minimum required $6,841 -
UD1021 #04 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $8,342 -
UD1021 #03 Y:2020 Meter recycled water (to reduce sewer charges) $5,965 $1,400
UD1021 #02 Y:2020 Recharge batteries on during off-peak demand periods $32,724 -
UD1021 #01 Y:2020 Turn off equipment during breaks, reduce operating time $10,283 -
MA0798 #09 Y:2018 Re-size charging openings or add movable cover or door $512 $200
MA0798 #08 Y:2018 Use or replace with energy efficient substitutes $922 $978
MA0798 #07 Y:2018 Install vinyl strip / high speed / air curtain doors $1,849 $2,001
MA0798 #06 Y:2018 Install heat pipes / raise cooling setpoint $2,585 $500
MA0798 #05 Y:2018 Insulate bare equipment $3,333 $1,801
MA0798 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $3,904 $2,765
MA0798 #03 Y:2018 Recover waste heat from equipment $7,569 $8,930
MA0798 #02 Y:2018 Use cooling tower or economizer to replace chiller cooling $18,484 $80,000
MA0798 #01 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $39,625 $48,500