209
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UC2608 #05 Y:2026 | 05 | 2026 | Utilize higher efficiency lamps and/or ballasts | $902 | $2,450 |
n/a
|
| UC2608 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $7,558 | $1,500 |
n/a
|
| UC2608 #03 Y:2026 | 03 | 2026 | Reduce ventilation air | $1,410 | $6,600 |
n/a
|
| UC2608 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $6,592 | - |
n/a
|
| UC2608 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,873 | $715 |
n/a
|
| UU0287 #10 Y:2025 | 10 | 2025 | Turn off equipment when not in use | $8,070 | $4,800 | |
| UU0287 #09 Y:2025 | 09 | 2025 | Insulate bare equipment | $3,100 | $5,260 | |
| UU0287 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,100 | $5,900 | |
| UU0287 #07 Y:2025 | 07 | 2025 | Eliminate or reduce compressed air usage | $11,700 | $11,700 | |
| UU0287 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $75,500 | $160,000 | |
| UU0287 #05 Y:2025 | 05 | 2025 | Use solar heat to make electricty | $32,200 | $261,000 | |
| UU0287 #04 Y:2025 | 04 | 2025 | Use plant owned transformers or lease transformers | $7,500 | $10,500 | |
| UU0287 #03 Y:2025 | 03 | 2025 | Change rate schedules or other changes in utility service | $16,300 | $2,160 | |
| UU0287 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $40,400 | $39,000 | |
| UU0287 #01 Y:2025 | 01 | 2025 | Use battery storage for demand control | $54,000 | $20,000 | |
| UC2404 #07 Y:2024 | 07 | 2024 | Use most efficient type of electric motors | $6,858 | $17,884 |
n/a
|
| UC2404 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $197,215 | $1,521,757 |
n/a
|
| UC2404 #05 Y:2024 | 05 | 2024 | Utilize controls to operate equipment only when needed | $12,057 | $90 |
n/a
|
| UC2404 #04 Y:2024 | 04 | 2024 | Use optimum size and capacity equipment | $15,710 | $84,000 |
n/a
|
| UC2404 #03 Y:2024 | 03 | 2024 | Optimize plant power factor | $4,186 | $21,381 |
n/a
|