2,654
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UA0301 #09 Y:2025 | 09 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $199 | $86 |
n/a
|
| UA0301 #08 Y:2025 | 08 | 2025 | Utilize higher efficiency lamps and/or ballasts | $753 | $3,317 |
n/a
|
| UA0301 #07 Y:2025 | 07 | 2025 | Install occupancy sensors | $3,160 | $603 |
n/a
|
| UA0301 #06 Y:2025 | 06 | 2025 | Reduce the pressure of compressed air to the minimum required | $8,289 | $670 |
n/a
|
| UA0301 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $11,512 | $21,363 |
n/a
|
| UA0301 #04 Y:2025 | 04 | 2025 | Install timers and/or thermostats | $371 | $482 |
n/a
|
| UA0301 #03 Y:2025 | 03 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,981 | $4,771 |
n/a
|
| UA0301 #02 Y:2025 | 02 | 2025 | Replace existing hvac unit with high efficiency model | $51,128 | $122,356 |
n/a
|
| UA0301 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $129,998 | $1,628,940 |
n/a
|
| NT0052 #05 Y:2025 | 05 | 2025 | Lower light fixtures in high ceiling areas | $400,000 | $112,035 |
n/a
|
| NT0052 #04 Y:2025 | 04 | 2025 | Purchase new equipment to reduce material use / cost | $180,689 | $135,000 |
n/a
|
| NT0052 #03 Y:2025 | 03 | 2025 | Replace existing hvac unit with high efficiency model | $110,740 | $106,736 |
n/a
|
| NT0052 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $6,191 | - |
n/a
|
| NT0052 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,372 | $5,609 |
n/a
|
| MI0464 #06 Y:2025 | 06 | 2025 | Turn off equipment when not in use | $1,948 | $2,600 |
n/a
|
| MI0464 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,193 | $1,665 |
n/a
|
| MI0464 #04 Y:2025 | 04 | 2025 | Air condition only space necessary | $5,341 | $960 |
n/a
|
| MI0464 #03 Y:2025 | 03 | 2025 | Close holes and openings in building such as broken windows | $5,173 | $485 |
n/a
|
| MI0464 #02 Y:2025 | 02 | 2025 | Utilize controls to operate equipment only when needed | $3,243 | - |
n/a
|
| MI0464 #01 Y:2025 | 01 | 2025 | Lower temperature during the winter season and vice-versa | $2,522 | - |
n/a
|