Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Radio and television broadcasting and communications equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0864 #09 Y:2012 Replace existing chiller with high efficiency model $27,112 $122,500
UD0864 #08 Y:2012 Use properly designed and sized hvac equipment $191,536 $383,074
UD0864 #07 Y:2012 Turn off equipment when not in use $1,934 -
UD0864 #06 Y:2012 Install compressor air intakes in coolest locations $888 $1,300
UD0864 #05 Y:2012 Upgrade controls on compressors $5,184 -
UD0864 #04 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $2,365 $2,650
UD0864 #03 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $2,365 $2,650
UD0864 #02 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $6,307 $2,925
UD0864 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $6,307 $2,925
UD0040 #04 Y:1982 Reschedule plant operations or reduce load to avoid peaks $363 $24
UD0040 #03 Y:1982 Reduce hot water temperature to the minimum required $424 -
UD0040 #02 Y:1982 Install compressor air intakes in coolest locations $176 $300
UD0040 #01 Y:1982 Utilize higher efficiency lamps and/or ballasts $2,038 $760