| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0985 #07 Y:2018 | 07 | 2018 | Lease / purchase baler; sell cardboard to recycler | $30,420 | $25,000 | |
| UD0985 #06 Y:2018 | 06 | 2018 | Utilize higher efficiency lamps and/or ballasts | $12,998 | $55,816 | |
| UD0985 #05 Y:2018 | 05 | 2018 | Install compressor air intakes in coolest locations | $320 | $1,500 | |
| UD0985 #04 Y:2018 | 04 | 2018 | Eliminate or reduce compressed air usage | $938 | - | |
| UD0985 #03 Y:2018 | 03 | 2018 | Use optimum size and capacity equipment | $957 | $2,500 | |
| UD0985 #02 Y:2018 | 02 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,260 | $1,000 | |
| UD0985 #01 Y:2018 | 01 | 2018 | Turn off equipment during breaks, reduce operating time | $2,113 | - | |
| UD0922 #11 Y:2015 | 11 | 2015 | Reduce space conditioning during non-working hours | $10,020 | - | |
| UD0922 #10 Y:2015 | 10 | 2015 | Lower temperature during the winter season and vice-versa | $39,230 | $67,300 | |
| UD0922 #09 Y:2015 | 09 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,813 | $1,000 | |
| UD0922 #08 Y:2015 | 08 | 2015 | Recover waste heat from equipment | $7,944 | $1,500 | |
| UD0922 #07 Y:2015 | 07 | 2015 | Turn off equipment during breaks, reduce operating time | $11,367 | - | |
| UD0922 #06 Y:2015 | 06 | 2015 | Eliminate or reduce compressed air usage | $61,348 | $65,000 | |
| UD0922 #05 Y:2015 | 05 | 2015 | Use flow control valves on equipment to optimize water use | $33,724 | $600 | |
| UD0922 #04 Y:2015 | 04 | 2015 | Replace city water with recycled water via cooling tower | $103,649 | $29,400 | |
| UD0922 #03 Y:2015 | 03 | 2015 | Install / repair insulation on condensate lines | $122 | $140 | |
| UD0922 #02 Y:2015 | 02 | 2015 | Use waste heat from hot flue gases to preheat | $23,063 | $4,947 | |
| UD0922 #01 Y:2015 | 01 | 2015 | Analyze flue gas for proper air/fuel ratio | $31,816 | - | |
| UD0418 #06 Y:1993 | 06 | 1993 | Recover and reuse cooling water | $12,300 | $1,000 | |
| UD0418 #05 Y:1993 | 05 | 1993 | Install vinyl strip / high speed / air curtain doors | $31,259 | $6,000 |