Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pumps and pumping equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0985 #07 Y:2018 Lease / purchase baler; sell cardboard to recycler $30,420 $25,000
UD0985 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $12,998 $55,816
UD0985 #05 Y:2018 Install compressor air intakes in coolest locations $320 $1,500
UD0985 #04 Y:2018 Eliminate or reduce compressed air usage $938 -
UD0985 #03 Y:2018 Use optimum size and capacity equipment $957 $2,500
UD0985 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $3,260 $1,000
UD0985 #01 Y:2018 Turn off equipment during breaks, reduce operating time $2,113 -
UD0922 #11 Y:2015 Reduce space conditioning during non-working hours $10,020 -
UD0922 #10 Y:2015 Lower temperature during the winter season and vice-versa $39,230 $67,300
UD0922 #09 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $5,813 $1,000
UD0922 #08 Y:2015 Recover waste heat from equipment $7,944 $1,500
UD0922 #07 Y:2015 Turn off equipment during breaks, reduce operating time $11,367 -
UD0922 #06 Y:2015 Eliminate or reduce compressed air usage $61,348 $65,000
UD0922 #05 Y:2015 Use flow control valves on equipment to optimize water use $33,724 $600
UD0922 #04 Y:2015 Replace city water with recycled water via cooling tower $103,649 $29,400
UD0922 #03 Y:2015 Install / repair insulation on condensate lines $122 $140
UD0922 #02 Y:2015 Use waste heat from hot flue gases to preheat $23,063 $4,947
UD0922 #01 Y:2015 Analyze flue gas for proper air/fuel ratio $31,816 -
UD0418 #06 Y:1993 Recover and reuse cooling water $12,300 $1,000
UD0418 #05 Y:1993 Install vinyl strip / high speed / air curtain doors $31,259 $6,000