Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metalworking machinery, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0608 #11 Y:2026 Install compressor air intakes in coolest locations $80 $352
SU0608 #10 Y:2026 Conserve energy by efficient use of vending machines $429 $1,559
SU0608 #09 Y:2026 Improve air circulation with destratification fans / other methods $4,788 $14,148
SU0608 #08 Y:2026 Use or replace with energy efficient substitutes $451 $1,009
SU0608 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $584 $122
SU0608 #06 Y:2026 Reduce space conditioning during non-working hours $190 -
SU0608 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $194 -
SU0608 #04 Y:2026 Eliminate/reduce an operation $5,760 -
SU0608 #03 Y:2026 Install spectral reflectors / delamp $878 -
SU0608 #02 Y:2026 Apply for tax-free status for energy purchases $4,915 -
SU0608 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,444 -
MU0026 #10 Y:2023 Apply for tax-free status for energy purchases $2,402 -
MU0026 #09 Y:2023 Use proper thickness of insulation on building envelope $211 $522
MU0026 #08 Y:2023 Install vinyl strip / high speed / air curtain doors $23,547 $85,720
MU0026 #07 Y:2023 Lower temperature during the winter season and vice-versa $4,405 -
MU0026 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $419 $1,650
MU0026 #05 Y:2023 Use photocell controls $88 $349
MU0026 #04 Y:2023 Reduce illumination to minimum necessary levels $181 -
MU0026 #03 Y:2023 Turn off equipment when not in use $101,263 -
MU0026 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $905 $133