Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonferrous forgings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0538 #09 Y:2016 Eliminate or reduce compressed air usage $577 $1,000
SD0538 #08 Y:2016 Use most efficient type of electric motors $877 $1,988
SD0538 #07 Y:2016 Turn off equipment during breaks, reduce operating time $952 $750
SD0538 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $5,200 $13,950
SD0538 #05 Y:2016 Insulate bare equipment $5,664 $2,520
SD0538 #04 Y:2016 Utilize daylight whenever possible in lieu of artificial light $12,722 $54,880
SD0538 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $17,549 $26,272
SD0538 #02 Y:2016 Improve combustion control capability $17,613 $46,250
SD0538 #01 Y:2016 Optimize plant power factor $29,703 $94,750
SD0511 #06 Y:2015 Insulate bare equipment $812 $2,323
SD0511 #05 Y:2015 Install occupancy sensors $2,105 $1,508
SD0511 #04 Y:2015 Use most efficient type of electric motors $2,296 $6,475
SD0511 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,658 $2,000
SD0511 #02 Y:2015 Reschedule plant operations or reduce load to avoid peaks $9,418 $1,750
SD0511 #01 Y:2015 Use waste heat from hot flue gases to preheat $12,106 $21,000
DL0084 #04 Y:2012 Reduce the pressure of compressed air to the minimum required $3,252 $20
DL0084 #03 Y:2012 Lower temperature during the winter season and vice-versa $6,919 $20
DL0084 #02 Y:2012 Use waste heat from hot flue gases to preheat $8,216 $35,000
DL0084 #01 Y:2012 Adjust burners for efficient operation $1,825 $500
UA3011 #13 Y:2010 Insulate bare equipment $5,251 $1,503