Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

727

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Iron and steel forgings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0061 #05 Y:2024 Reduce illumination to minimum necessary levels $1,297 $728
TR0061 #04 Y:2024 Replace existing hvac unit with high efficiency model $16,588 $55,200
TR0061 #03 Y:2024 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,219 $4,350
TR0061 #02 Y:2024 Cool compressor air intake with heat exchanger $9,288 $17,929
TR0061 #01 Y:2024 Use solar heat to make electricty $121,083 $551,388
WM0230 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,358 $2,488
WM0230 #03 Y:2024 Reduce space conditioning during non-working hours $1,667 $900
WM0230 #02 Y:2024 Eliminate or reduce compressed air usage $2,743 $4,500
WM0230 #01 Y:2024 Use waste heat from hot flue gases to preheat $155,302 $120,000
WV0640 #12 Y:2023 Eliminate or reduce compressed air usage $66 $178
WV0640 #11 Y:2023 Insulate bare equipment $930 $135
WV0640 #10 Y:2023 Use or replace with energy efficient substitutes $1,582 $5,558
WV0640 #09 Y:2023 Upgrade controls on compressors $2,907 $11,135
WV0640 #08 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,011 $596
WV0640 #07 Y:2023 Develop a repair/replace policy $3,201 $1,563
WV0640 #06 Y:2023 Establish a predictive maintenance program $3,905 $1,500
WV0640 #05 Y:2023 Turn off equipment when not in use $5,135 $10,165
WV0640 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $6,002 $9,194
WV0640 #03 Y:2023 Use waste heat to produce steam to drive a steam turbine-generator $43,563 $209,750
WV0640 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $43,670 $212,780