Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Iron and steel forgings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ND0274 #07 Y:1997 Close holes and openings in building such as broken windows $172 $449
ND0274 #06 Y:1997 Utilize higher efficiency lamps and/or ballasts $297 $144
ND0274 #05 Y:1997 Utilize higher efficiency lamps and/or ballasts $460 $650
ND0274 #04 Y:1997 Install compressor air intakes in coolest locations $2,078 $1,500
ND0274 #03 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $6,526 $240
ND0274 #02 Y:1997 Optimize plant power factor $10,153 $15,462
ND0274 #01 Y:1997 Use most efficient type of electric motors $9,097 $1,655
ND0171 #13 Y:1993 Turn off equipment when not in use $124 -
ND0171 #12 Y:1993 Install vinyl strip / high speed / air curtain doors $421 $2,020
ND0171 #11 Y:1993 Cover open tanks $869 $1,002
ND0171 #10 Y:1993 Utilize higher efficiency lamps and/or ballasts $918 $772
ND0171 #09 Y:1993 Install vinyl strip / high speed / air curtain doors $1,056 $430
ND0171 #08 Y:1993 Install vinyl strip / high speed / air curtain doors $1,330 $3,655
ND0171 #07 Y:1993 Install vinyl strip / high speed / air curtain doors $1,880 $1,290
ND0171 #06 Y:1993 Recover waste heat from equipment $3,240 $3,890
ND0171 #05 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $6,000 $1,000
ND0171 #04 Y:1993 Heat treat parts only to required specifications or standards $7,558 $8,500
ND0171 #03 Y:1993 Optimize plant power factor $12,500 $22,673
ND0171 #02 Y:1993 Insulate glazing, walls, ceilings, and roofs $17,072 $60,040
ND0171 #01 Y:1993 Use most efficient type of electric motors $5,964 $4,533