Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

626

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal heat treating
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0341 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,180 $732
IC0341 #07 Y:2026 Use insulation in furnaces to facilitate heating / cooling $5,148 $20,800
IC0341 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,850 $26,620
IC0341 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $45,344 $21,031
IC0341 #04 Y:2026 Install compressor air intakes in coolest locations $445 $760
IC0341 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $540 $282
IC0341 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $629 $2,060
IC0341 #01 Y:2026 Optimize plant power factor $30,000 $112,624
CI0049 #11 Y:2025 Use most efficient type of electric motors $918 $470
CI0049 #10 Y:2025 Use waste heat from hot flue gases to preheat $5,572 $11,000
CI0049 #09 Y:2025 Replace fossil fuel equipment with electrical equipment $9,652 $40,000
CI0049 #08 Y:2025 Use power during off-peak periods $13,567 $22,000
CI0049 #07 Y:2025 Adopt in-house material generation $13,673 $350,000
CI0049 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $14,474 $5,000
CI0049 #05 Y:2025 Adjust burners for efficient operation $18,240 $44,000
CI0049 #04 Y:2025 Use battery storage for demand control $17,261 $58,000
CI0049 #03 Y:2025 Adopt in-house material generation $18,814 $22,000
CI0049 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $28,480 $125,000
CI0049 #01 Y:2025 Replace boiler $31,771 $18,000
SD0676 #11 Y:2025 Install common header on compressors $2,478 $2,050