626
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Metal heat treating | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IC0341 #08 Y:2026 | 08 | 2026 | Utilize higher efficiency lamps and/or ballasts | $3,180 | $732 |
n/a
|
| IC0341 #07 Y:2026 | 07 | 2026 | Use insulation in furnaces to facilitate heating / cooling | $5,148 | $20,800 |
n/a
|
| IC0341 #06 Y:2026 | 06 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $5,850 | $26,620 |
n/a
|
| IC0341 #05 Y:2026 | 05 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $45,344 | $21,031 |
n/a
|
| IC0341 #04 Y:2026 | 04 | 2026 | Install compressor air intakes in coolest locations | $445 | $760 |
n/a
|
| IC0341 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $540 | $282 |
n/a
|
| IC0341 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $629 | $2,060 |
n/a
|
| IC0341 #01 Y:2026 | 01 | 2026 | Optimize plant power factor | $30,000 | $112,624 |
n/a
|
| CI0049 #11 Y:2025 | 11 | 2025 | Use most efficient type of electric motors | $918 | $470 |
n/a
|
| CI0049 #10 Y:2025 | 10 | 2025 | Use waste heat from hot flue gases to preheat | $5,572 | $11,000 |
n/a
|
| CI0049 #09 Y:2025 | 09 | 2025 | Replace fossil fuel equipment with electrical equipment | $9,652 | $40,000 |
n/a
|
| CI0049 #08 Y:2025 | 08 | 2025 | Use power during off-peak periods | $13,567 | $22,000 |
n/a
|
| CI0049 #07 Y:2025 | 07 | 2025 | Adopt in-house material generation | $13,673 | $350,000 |
n/a
|
| CI0049 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,474 | $5,000 |
n/a
|
| CI0049 #05 Y:2025 | 05 | 2025 | Adjust burners for efficient operation | $18,240 | $44,000 |
n/a
|
| CI0049 #04 Y:2025 | 04 | 2025 | Use battery storage for demand control | $17,261 | $58,000 |
n/a
|
| CI0049 #03 Y:2025 | 03 | 2025 | Adopt in-house material generation | $18,814 | $22,000 |
n/a
|
| CI0049 #02 Y:2025 | 02 | 2025 | Replace fossil fuel equipment with electrical equipment | $28,480 | $125,000 |
n/a
|
| CI0049 #01 Y:2025 | 01 | 2025 | Replace boiler | $31,771 | $18,000 |
n/a
|
| SD0676 #11 Y:2025 | 11 | 2025 | Install common header on compressors | $2,478 | $2,050 |