47
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Metal heat treating | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1100 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $5,007 | $8,000 | |
| UD1100 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $5,242 | $7,768 | |
| UD1100 #06 Y:2024 | 06 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $3,587 | - | |
| UD1100 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $12,387 | $23,400 | |
| UD1100 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,770 | $1,000 | |
| UD1100 #03 Y:2024 | 03 | 2024 | Reduce space conditioning during non-working hours | $879 | - | |
| UD1100 #02 Y:2024 | 02 | 2024 | Keep doors and windows shut when not on use | $1,520 | - | |
| UD1100 #01 Y:2024 | 01 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $118 | $200 | |
| UD0856 #12 Y:2012 | 12 | 2012 | Use solar heat to make electricty | $27,298 | $181,738 | |
| UD0856 #11 Y:2012 | 11 | 2012 | Reduce ventilation air | $4,756 | $8,600 | |
| UD0856 #10 Y:2012 | 10 | 2012 | Replace electrically-operated equipment with fossil fuel equipment | $11,452 | $30,000 | |
| UD0856 #09 Y:2012 | 09 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $240 | $1,000 | |
| UD0856 #08 Y:2012 | 08 | 2012 | Reduce the pressure of compressed air to the minimum required | $782 | $50 | |
| UD0856 #07 Y:2012 | 07 | 2012 | Install compressor air intakes in coolest locations | $1,339 | $1,500 | |
| UD0856 #06 Y:2012 | 06 | 2012 | Eliminate or reduce compressed air usage | $1,802 | $700 | |
| UD0856 #05 Y:2012 | 05 | 2012 | Eliminate or reduce compressed air usage | $3,442 | $2,160 | |
| UD0856 #04 Y:2012 | 04 | 2012 | Size electric motors for peak operating efficiency | $6,690 | $5,370 | |
| UD0856 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $441 | $2,025 | |
| UD0856 #02 Y:2012 | 02 | 2012 | Install occupancy sensors | $720 | $300 | |
| UD0856 #01 Y:2012 | 01 | 2012 | Utilize higher efficiency lamps and/or ballasts | $6,482 | $8,415 |