Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Copper foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0916 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $14,413 $26,040
UD0916 #04 Y:2014 Recover heat from exhausted steam, hot air or hot water $25,351 $43,280
UD0916 #03 Y:2014 Install motor voltage controller on lightly loaded motors $6,076 $11,700
UD0916 #02 Y:2014 Utilize energy-efficient belts and other improved mechanisms $2,027 -
UD0916 #01 Y:2014 Turn off equipment when not in use $5,270 -
MA0647 #04 Y:2008 Install / repair insulation on steam lines $372 $400
MA0647 #03 Y:2008 Turn off equipment when not in use $458 -
MA0647 #02 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $5,543 $1,200
MA0647 #01 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $20,325 $30,000
BD0346 #09 Y:2008 Use radiant heater for spot heating $19,119 $14,001
BD0346 #08 Y:2008 Direct warmest air to combustion intake $4,096 $1,251
BD0346 #07 Y:2008 Replace boiler $37,675 $65,001
BD0346 #06 Y:2008 Install compressor air intakes in coolest locations $833 $501
BD0346 #05 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $48,385 $10,001
BD0346 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $893 $1,366
BD0346 #03 Y:2008 Utilize daylight whenever possible in lieu of artificial light $4,548 $4,569
BD0346 #02 Y:2008 Install occupancy sensors $1,472 $676
BD0346 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $84,447 $2,972
UM0336 #09 Y:2007 Install vinyl strip / high speed / air curtain doors $93 $93
UM0336 #08 Y:2007 Turn off equipment when not in use $2,766 $260