261
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Rolling, drawing, and extruding of copper | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IP0188 #09 Y:2024 | 09 | 2024 | Use immersion heating in tanks, melting pots, etc | $1,660 | $947 | |
IP0188 #08 Y:2024 | 08 | 2024 | Use radiant heater for spot heating | $4,200 | $5,429 | |
IP0188 #07 Y:2024 | 07 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $4,671 | $49 | |
IP0188 #06 Y:2024 | 06 | 2024 | Reduce space conditioning during non-working hours | $8,621 | $438 | |
IP0188 #05 Y:2024 | 05 | 2024 | Eliminate or reduce compressed air usage | $9,737 | $750 | |
IP0188 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $12,293 | $2,560 | |
IP0188 #03 Y:2024 | 03 | 2024 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $20,000 | $650 | |
IP0188 #02 Y:2024 | 02 | 2024 | Recharge batteries on during off-peak demand periods | $27,927 | $2,500 | |
IP0188 #01 Y:2024 | 01 | 2024 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $191,070 | $2,400 | |
IP0184 #05 Y:2023 | 05 | 2023 | Utilize higher efficiency lamps and/or ballasts | $4,142 | $12,019 | |
IP0184 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $31,216 | $17,960 | |
IP0184 #03 Y:2023 | 03 | 2023 | Install compressor air intakes in coolest locations | $8,667 | $2,615 | |
IP0184 #02 Y:2023 | 02 | 2023 | Use minimum steam operating pressure | $83,429 | $20,365 | |
IP0184 #01 Y:2023 | 01 | 2023 | Use demand controller or load shedder | $14,493 | - | |
IP0136 #07 Y:2020 | 07 | 2020 | Replace existing hvac unit with high efficiency model | $2,172 | $8,600 | |
IP0136 #06 Y:2020 | 06 | 2020 | Utilize higher efficiency lamps and/or ballasts | $27,563 | $32,451 | |
IP0136 #05 Y:2020 | 05 | 2020 | Replace electrically-operated equipment with fossil fuel equipment | $12,685 | $10,860 | |
IP0136 #04 Y:2020 | 04 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,455 | $69 | |
IP0136 #03 Y:2020 | 03 | 2020 | Reduce the pressure of compressed air to the minimum required | $3,490 | $131 | |
IP0136 #02 Y:2020 | 02 | 2020 | Lower temperature during the winter season and vice-versa | $921 | - |