138
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Ceramic wall and floor tile | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0316 #11 Y:2024 | 11 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,763 | $1,345 |
n/a
|
TT0316 #10 Y:2024 | 10 | 2024 | Recover waste heat from equipment | $5,587 | $1,500 |
n/a
|
TT0316 #09 Y:2024 | 09 | 2024 | Reduce the pressure of compressed air to the minimum required | $7,504 | $60 |
n/a
|
TT0316 #08 Y:2024 | 08 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $10,806 | $12,000 |
n/a
|
TT0316 #07 Y:2024 | 07 | 2024 | Turn off equipment when not in use | $11,283 | $30 |
n/a
|
TT0316 #06 Y:2024 | 06 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $17,400 | $10,380 |
n/a
|
TT0316 #05 Y:2024 | 05 | 2024 | Close outdoor air dampers during warm-up / cool-down periods | $18,330 | $3,200 |
n/a
|
TT0316 #04 Y:2024 | 04 | 2024 | Meter waste water | $22,342 | $10,000 |
n/a
|
TT0316 #03 Y:2024 | 03 | 2024 | Change rate schedules or other changes in utility service | $147,843 | $200,000 |
n/a
|
TT0316 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $259,778 | $1,375,785 |
n/a
|
TT0316 #01 Y:2024 | 01 | 2024 | Change rate schedules or other changes in utility service | $1,156,718 | $75,000 |
n/a
|
TT0311 #07 Y:2024 | 07 | 2024 | Lower temperature during the winter season and vice-versa | $510 | - |
n/a
|
TT0311 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,298 | $1,735 |
n/a
|
TT0311 #05 Y:2024 | 05 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $5,792 | $3,400 |
n/a
|
TT0311 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $5,957 | $30 |
n/a
|
TT0311 #03 Y:2024 | 03 | 2024 | Recover waste heat from equipment | $10,039 | $16,000 |
n/a
|
TT0311 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $20,187 | $9,000 |
n/a
|
TT0311 #01 Y:2024 | 01 | 2024 | Install occupancy sensors | $52,706 | $69,233 |
n/a
|
UA0254 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,608 | $2,502 | |
UA0254 #02 Y:2022 | 02 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $2,515 | $12,000 |