Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Yarn texturizing, throwing, twisting, and winding mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0293 #07 Y:2024 Use most efficient type of electric motors $11,137 $31,288
UA0293 #06 Y:2024 Optimize plant power factor $5,132 $2,136
UA0293 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $79,741 $24,242
UA0293 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $16,406 $1,000
UA0293 #03 Y:2024 Install outside air damper / economizer on hvac unit $463,239 $2,689,776
UA0293 #02 Y:2024 Replace existing hvac unit with high efficiency model $72,334 $322,191
UA0293 #01 Y:2024 Install timers and/or thermostats $2,449 $868
UA0192 #06 Y:2018 Use most efficient type of electric motors $70,431 $386,914
UA0192 #05 Y:2018 Install outside air damper / economizer on hvac unit $76,893 $19,300
UA0192 #04 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $31,273 $3,165
UA0192 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $14,416 $200
UA0192 #02 Y:2018 Install occupancy sensors $1,298 $366
UA0192 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $15,821 $22,134
GT0867 #06 Y:2009 Use synthetic lubricant $1,440 -
GT0867 #05 Y:2009 Reschedule plant operations or reduce load to avoid peaks $10,949 -
GT0867 #04 Y:2009 Eliminate or reduce compressed air usage $14,518 $6,000
GT0867 #03 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $17,426 $3,250
GT0867 #02 Y:2009 Install timers on light switches in little used areas $8,794 $4,000
GT0867 #01 Y:2009 Utilize higher efficiency lamps and/or ballasts $52,318 $89,971
GT0739 #08 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $658 $500