Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Broadwoven fabric mills, manmade fiber and silk
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0564 #08 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $1,605 $12,000
SU0564 #07 Y:2024 Install occupancy sensors $124 $723
SU0564 #06 Y:2024 Install back-up equipment $32,534 $169,100
SU0564 #05 Y:2024 Install compressor air intakes in coolest locations $4,420 $332
SU0564 #04 Y:2024 Recover waste heat from equipment $3,312 $118
SU0564 #03 Y:2024 Eliminate or reduce compressed air usage $3,941 -
SU0564 #02 Y:2024 Pay bills on time to avoid late fees $1,442 -
SU0564 #01 Y:2024 Disconnect ballasts $103 -
CL2105 #11 Y:2021 Use flow control valves on equipment to optimize water use $982 $3,050
CL2105 #10 Y:2021 Replace treated water with well / surface water $2,591 $600
CL2105 #09 Y:2021 Install waste heat boiler to provide direct power $24,497 $17,450
CL2105 #08 Y:2021 Utilize energy-efficient belts and other improved mechanisms $25,046 $7,102
CL2105 #07 Y:2021 Use optimum temperature $81,375 -
CL2105 #06 Y:2021 Keep doors and windows shut when not on use $63 -
CL2105 #05 Y:2021 Use solar heat to make electricty $567,975 $4,358,847
CL2105 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $23,819 $2,100
CL2105 #03 Y:2021 Reschedule plant operations or reduce load to avoid peaks $34,939 $1,120
CL2105 #02 Y:2021 Install occupancy sensors $25,163 $8,200
CL2105 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $69,993 $55,908
GT0932 #06 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $9,678 $14,251