256
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Broadwoven fabric mills, manmade fiber and silk | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CL2105 #11 Y:2021 | 11 | 2021 | Use flow control valves on equipment to optimize water use | $982 | $3,050 | |
| CL2105 #10 Y:2021 | 10 | 2021 | Replace treated water with well / surface water | $2,591 | $600 | |
| CL2105 #09 Y:2021 | 09 | 2021 | Install waste heat boiler to provide direct power | $24,497 | $17,450 | |
| CL2105 #08 Y:2021 | 08 | 2021 | Utilize energy-efficient belts and other improved mechanisms | $25,046 | $7,102 | |
| CL2105 #07 Y:2021 | 07 | 2021 | Use optimum temperature | $81,375 | - | |
| CL2105 #06 Y:2021 | 06 | 2021 | Keep doors and windows shut when not on use | $63 | - | |
| CL2105 #05 Y:2021 | 05 | 2021 | Use solar heat to make electricty | $567,975 | $4,358,847 | |
| CL2105 #04 Y:2021 | 04 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $23,819 | $2,100 | |
| CL2105 #03 Y:2021 | 03 | 2021 | Reschedule plant operations or reduce load to avoid peaks | $34,939 | $1,120 | |
| CL2105 #02 Y:2021 | 02 | 2021 | Install occupancy sensors | $25,163 | $8,200 | |
| CL2105 #01 Y:2021 | 01 | 2021 | Utilize higher efficiency lamps and/or ballasts | $69,993 | $55,908 | |
| GT0932 #06 Y:2019 | 06 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $9,678 | $14,251 | |
| GT0932 #05 Y:2019 | 05 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $899 | $1,117 | |
| GT0932 #04 Y:2019 | 04 | 2019 | Insulate bare equipment | $4,768 | $5,877 | |
| GT0932 #03 Y:2019 | 03 | 2019 | Install occupancy sensors | $1,606 | $1,689 | |
| GT0932 #02 Y:2019 | 02 | 2019 | Insulate bare equipment | $495 | $382 | |
| GT0932 #01 Y:2019 | 01 | 2019 | Repair and eliminate steam leaks | $2,019 | $500 | |
| NC0613 #09 Y:2018 | 09 | 2018 | Develop a repair/replace policy | $2,479 | $5,865 | |
| NC0613 #08 Y:2018 | 08 | 2018 | Install spectral reflectors / delamp | $914 | $1,700 | |
| NC0613 #07 Y:2018 | 07 | 2018 | Change rate schedules or other changes in utility service | $27,242 | $500 |