Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Malt
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0777 #03 Y:2023 Eliminate or reduce compressed air usage $2,570 -
OR0777 #02 Y:2023 Install common header on compressors $2,832 $6,989
OR0777 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $8,479 -
CL2102 #04 Y:2021 Turn off equipment when not in use $6,049 -
CL2102 #03 Y:2021 Utilize energy-efficient belts and other improved mechanisms $2,176 $2,846
CL2102 #02 Y:2021 Install occupancy sensors $322 $453
CL2102 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $10,814 $3,180
OR0629 #04 Y:2014 Replace boiler $523,306 $3,403,664
OR0629 #03 Y:2014 Recover and reuse cooling water $58,681 $3,764
OR0629 #02 Y:2014 Re-use or recycle hot or cold process exhaust air $37,863 $38,930
OR0629 #01 Y:2014 Redesign flow to minimize mass transfer length $37,907 $21,000
IP0021 #08 Y:2013 Eliminate or reduce compressed air usage $4,868 $5,580
IP0021 #07 Y:2013 Install / repair insulation on steam lines $349 $231
IP0021 #06 Y:2013 Install occupancy sensors $222 $118
IP0021 #05 Y:2013 Reduce illumination to minimum necessary levels $3,336 -
IP0021 #04 Y:2013 Pay bills on time to avoid late fees $1,181 -
IP0021 #03 Y:2013 Reduce the pressure of compressed air to the minimum required $513 -
IP0021 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $2,655 -
IP0021 #01 Y:2013 Apply for investment incentives $4,267 -
WI0521 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $630 -