19
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Vegetable oil mills, except corn, cottonseed, and soybean | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SF0508 #06 Y:2017 | 06 | 2017 | Preheat boiler makeup water with waste process heat | $1,181 | $6,155 | |
SF0508 #05 Y:2017 | 05 | 2017 | Reduce the pressure of compressed air to the minimum required | $5,954 | $26,825 | |
SF0508 #04 Y:2017 | 04 | 2017 | Utilize higher efficiency lamps and/or ballasts | $7,172 | $20,431 | |
SF0508 #03 Y:2017 | 03 | 2017 | Avoid introducing hot, humid, or dirty air into hvac system | $640 | $553 | |
SF0508 #02 Y:2017 | 02 | 2017 | Reduce space conditioning during non-working hours | $20,198 | $2,023 | |
SF0508 #01 Y:2017 | 01 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,154 | - | |
SF0501 #06 Y:2017 | 06 | 2017 | Use solar heat to make electricty | $147,360 | $665,154 | |
SF0501 #05 Y:2017 | 05 | 2017 | Convert combustion equipment to burn natural gas | $2,356 | $1,821 | |
SF0501 #04 Y:2017 | 04 | 2017 | Utilize controls to operate equipment only when needed | $7,074 | $1,769 | |
SF0501 #03 Y:2017 | 03 | 2017 | Reduce the pressure of compressed air to the minimum required | $777 | $84 | |
SF0501 #02 Y:2017 | 02 | 2017 | Reschedule plant operations or reduce load to avoid peaks | $1,047 | - | |
SF0501 #01 Y:2017 | 01 | 2017 | Reduce space conditioning during non-working hours | $4,520 | - | |
CO0205 #07 Y:1990 | 07 | 1990 | Install timers and/or thermostats | $440 | $300 | |
CO0205 #06 Y:1990 | 06 | 1990 | Utilize energy-efficient belts and other improved mechanisms | $1,300 | $3,100 | |
CO0205 #05 Y:1990 | 05 | 1990 | Install compressor air intakes in coolest locations | $1,600 | $400 | |
CO0205 #04 Y:1990 | 04 | 1990 | Analyze flue gas for proper air/fuel ratio | $4,100 | $2,000 | |
CO0205 #03 Y:1990 | 03 | 1990 | Reschedule plant operations or reduce load to avoid peaks | $5,600 | $500 | |
CO0205 #02 Y:1990 | 02 | 1990 | Use most efficient type of electric motors | $1,331 | $2,240 | |
CO0205 #01 Y:1990 | 01 | 1990 | Purchase gas directly from a contract gas supplier | $10,700 | $6,500 |