176
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Prepared flour mixes and doughs | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MU0035 #06 Y:2023 | 06 | 2023 | Eliminate/reduce an operation | $13,378 | - | |
MU0035 #05 Y:2023 | 05 | 2023 | Reduce illumination to minimum necessary levels | $934 | - | |
MU0035 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $9,453 | $5,164 | |
MU0035 #03 Y:2023 | 03 | 2023 | Turn off equipment when not in use | $1,539 | - | |
MU0035 #02 Y:2023 | 02 | 2023 | Keep equipment clean | $216 | - | |
MU0035 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,081 | $374 | |
CM1016 #04 Y:2023 | 04 | 2023 | Apply for tax-free status for energy purchases | $46,159 | $16,000 |
n/a
|
CM1016 #03 Y:2023 | 03 | 2023 | Install / repair insulation on steam lines | $44,187 | $184,569 |
n/a
|
CM1016 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $4,413 | $6,724 |
n/a
|
CM1016 #01 Y:2023 | 01 | 2023 | Use solar heat to make electricty | $2,957 | - |
n/a
|
LS1806 #04 Y:2018 | 04 | 2018 | Convert liquid heaters from underfiring to immersion or submersion heating | $1,519 | $6,300 | |
LS1806 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $7,834 | $13,581 | |
LS1806 #02 Y:2018 | 02 | 2018 | Turn off equipment during breaks, reduce operating time | $11 | $9 | |
LS1806 #01 Y:2018 | 01 | 2018 | Reduce the pressure of compressed air to the minimum required | $168 | $100 | |
MZ0176 #09 Y:2015 | 09 | 2015 | Recover waste heat from equipment | $2,580 | $9,500 | |
MZ0176 #08 Y:2015 | 08 | 2015 | Install smaller boiler (increase high fire duty cycle) | $2,330 | $3,500 | |
MZ0176 #07 Y:2015 | 07 | 2015 | Install occupancy sensors | $30,675 | $7,500 | |
MZ0176 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $62,569 | $115,650 | |
MZ0176 #05 Y:2015 | 05 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,037 | $1,560 | |
MZ0176 #04 Y:2015 | 04 | 2015 | Eliminate or reduce compressed air usage | $1,923 | $1,000 |