Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Prepared flour mixes and doughs
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0035 #06 Y:2023 Eliminate/reduce an operation $13,378 -
MU0035 #05 Y:2023 Reduce illumination to minimum necessary levels $934 -
MU0035 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $9,453 $5,164
MU0035 #03 Y:2023 Turn off equipment when not in use $1,539 -
MU0035 #02 Y:2023 Keep equipment clean $216 -
MU0035 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,081 $374
CM1016 #04 Y:2023 Apply for tax-free status for energy purchases $46,159 $16,000
CM1016 #03 Y:2023 Install / repair insulation on steam lines $44,187 $184,569
CM1016 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,413 $6,724
CM1016 #01 Y:2023 Use solar heat to make electricty $2,957 -
LS1806 #04 Y:2018 Convert liquid heaters from underfiring to immersion or submersion heating $1,519 $6,300
LS1806 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $7,834 $13,581
LS1806 #02 Y:2018 Turn off equipment during breaks, reduce operating time $11 $9
LS1806 #01 Y:2018 Reduce the pressure of compressed air to the minimum required $168 $100
MZ0176 #09 Y:2015 Recover waste heat from equipment $2,580 $9,500
MZ0176 #08 Y:2015 Install smaller boiler (increase high fire duty cycle) $2,330 $3,500
MZ0176 #07 Y:2015 Install occupancy sensors $30,675 $7,500
MZ0176 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $62,569 $115,650
MZ0176 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $13,037 $1,560
MZ0176 #04 Y:2015 Eliminate or reduce compressed air usage $1,923 $1,000