Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Creamery butter
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0365 #15 Y:2019 Utilize energy-efficient belts and other improved mechanisms $141 $245
MI0365 #14 Y:2019 Use photocell controls $1,552 $216
MI0365 #13 Y:2019 Avoid introducing hot, humid, or dirty air into hvac system $3,252 $13,180
MI0365 #12 Y:2019 Maintain air filters by cleaning or replacement $3,967 $384
MI0365 #11 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $5,193 $1,980
MI0365 #10 Y:2019 Analyze flue gas for proper air/fuel ratio $7,083 $960
MI0365 #09 Y:2019 Install vinyl strip / high speed / air curtain doors $7,981 $6,228
MI0365 #08 Y:2019 Utilize higher efficiency lamps and/or ballasts $10,108 $11,078
MI0365 #07 Y:2019 Use heat from boiler blowdown to preheat boiler feed water $10,416 $10,416
MI0365 #06 Y:2019 Clean or color roof to reduce solar load $10,965 $6,898
MI0365 #05 Y:2019 Optimize plant power factor $11,189 $36,745
MI0365 #04 Y:2019 Use waste heat from hot flue gases to preheat $13,590 $13,390
MI0365 #03 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $10,931 $12,640
MI0365 #02 Y:2019 Repair or replace steam traps $22,459 $2,300
MI0365 #01 Y:2019 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $434,947 $1,742,938
UU0139 #04 Y:2018 Install timers and/or thermostats $446 $100
UU0139 #03 Y:2018 Use photocell controls $4,082 $2,275
UU0139 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $14,262 $20,223
UU0139 #01 Y:2018 Use / purchase optimum sized compressor $51,858 $44,642
BD0289 #11 Y:2005 Install automatic packing equipment $57,600 $105,000