13
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Bituminous coal and lignite surface mining | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
CO0532 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $139 | $139 | |
CO0532 #05 Y:2003 | 05 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $110 | |
CO0532 #04 Y:2003 | 04 | 2003 | Install adequate dryers on air lines to eliminate blowdown | $1,160 | $4,000 | |
CO0532 #03 Y:2003 | 03 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $2,530 | $6,580 | |
CO0532 #02 Y:2003 | 02 | 2003 | Utilize higher efficiency lamps and/or ballasts | $5,122 | $26,560 | |
CO0532 #01 Y:2003 | 01 | 2003 | Upgrade conveyors | $19,310 | $46,220 | |
CO0492 #07 Y:2001 | 07 | 2001 | Utilize higher efficiency lamps and/or ballasts | $130 | - | |
CO0492 #06 Y:2001 | 06 | 2001 | Lower temperature during the winter season and vice-versa | $2,160 | $3,610 | |
CO0492 #05 Y:2001 | 05 | 2001 | Recover waste heat from equipment | $2,280 | $2,060 | |
CO0492 #04 Y:2001 | 04 | 2001 | Lower temperature during the winter season and vice-versa | $3,040 | $6,460 | |
CO0492 #03 Y:2001 | 03 | 2001 | Use solar heat to heat make-up air | $4,980 | $29,800 | |
CO0492 #02 Y:2001 | 02 | 2001 | Improve air circulation with destratification fans / other methods | $6,010 | $8,660 | |
CO0492 #01 Y:2001 | 01 | 2001 | Use / purchase optimum sized compressor | $8,100 | $1,470 |