Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gold and silver ores
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0424 #09 Y:2002 Add equipment/ operators to reduce production bottleneck $14,715 $45,000
OR0424 #08 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $13,470 $12,200
OR0424 #07 Y:2002 Adjust burners for efficient operation $20,311 $1,000
OR0424 #06 Y:2002 Utilize energy-efficient belts and other improved mechanisms $25,349 -
OR0424 #05 Y:2002 Add equipment/ operators to reduce production bottleneck $69,350 $46,000
OR0424 #04 Y:2002 Use most efficient type of electric motors $119,700 $241,870
OR0424 #03 Y:2002 Recover heat from exhausted steam, hot air or hot water $158,150 $118,500
OR0424 #02 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $958,574 $1,727,000
OR0424 #01 Y:2002 Relocate oven / furnace to more efficient location $577,590 $207,147
OR0423 #06 Y:2002 Replace electrically-operated equipment with fossil fuel equipment $279,200 $2,000,000
OR0423 #05 Y:2002 Analyze flue gas for proper air/fuel ratio $38,900 -
OR0423 #04 Y:2002 Reschedule plant operations or reduce load to avoid peaks $35,800 $20,700
OR0423 #03 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $183,000 $120,860
OR0423 #02 Y:2002 Begin a practice of predictive / preventative maintenance $489,000 $410,000
OR0423 #01 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $518,000 $300,000
CO0516 #06 Y:2002 Insulate bare equipment $4,380 $900
CO0516 #05 Y:2002 Install compressor air intakes in coolest locations $9,370 $2,480
CO0516 #04 Y:2002 Eliminate or reduce compressed air usage $19,300 $38,900
CO0516 #03 Y:2002 Improve combustion control capability $44,200 $30,000
CO0516 #02 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $90,030 $21,080