19
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IA0474 #03 Y:2011 | 03 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $3,183 | $11,760 | |
IA0474 #02 Y:2011 | 02 | 2011 | Insulate glazing, walls, ceilings, and roofs | $2,851 | $5,045 | |
IA0474 #01 Y:2011 | 01 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,989 | $668 | |
UA3003 #08 Y:2010 | 08 | 2010 | Clean or color roof to reduce solar load | $1,679 | $5,534 | |
UA3003 #07 Y:2010 | 07 | 2010 | Install vinyl strip / high speed / air curtain doors | $5,858 | $8,376 | |
UA3003 #06 Y:2010 | 06 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,018 | $1,500 | |
UA3003 #05 Y:2010 | 05 | 2010 | Reduce the pressure of compressed air to the minimum required | $3,872 | $640 | |
UA3003 #04 Y:2010 | 04 | 2010 | Use photocell controls | $367 | $1,000 | |
UA3003 #03 Y:2010 | 03 | 2010 | Install occupancy sensors | $120 | $129 | |
UA3003 #02 Y:2010 | 02 | 2010 | Install occupancy sensors | $190 | $129 | |
UA3003 #01 Y:2010 | 01 | 2010 | Utilize higher efficiency lamps and/or ballasts | $24,940 | $18,577 | |
MI0065 #08 Y:2003 | 08 | 2003 | Replace existing hvac unit with high efficiency model | $2,740 | $8,820 | n/a |
MI0065 #07 Y:2003 | 07 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $283 | $244 | n/a |
MI0065 #06 Y:2003 | 06 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $42 | $231 | n/a |
MI0065 #05 Y:2003 | 05 | 2003 | Reduce the pressure of compressed air to the minimum required | $370 | $85 | n/a |
MI0065 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $207 | $325 | n/a |
MI0065 #03 Y:2003 | 03 | 2003 | Install / repair insulation on steam lines | $2,876 | $4,556 | n/a |
MI0065 #02 Y:2003 | 02 | 2003 | Turn off equipment when not in use | $19,897 | $1,900 | n/a |
MI0065 #01 Y:2003 | 01 | 2003 | Change rate schedules or other changes in utility service | $12,419 | - | n/a |