Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Refrigeration equipment and supplies merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0042 #09 Y:2009 Clean or color roof to reduce solar load $469 $4,845
DL0042 #08 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $16,400 $41,000
DL0042 #07 Y:2009 Improve air circulation with destratification fans / other methods $18,600 $36,600
DL0042 #06 Y:2009 Reduce the pressure of compressed air to the minimum required $982 $500
DL0042 #05 Y:2009 Install compressor air intakes in coolest locations $2,332 $368
DL0042 #04 Y:2009 Add area lighting switches $11,009 $1,325
DL0042 #03 Y:2009 Insulate glazing, walls, ceilings, and roofs $28,200 $1,760
DL0042 #02 Y:2009 Install vinyl strip / high speed / air curtain doors $10,180 $19,200
DL0042 #01 Y:2009 Reduce illumination to minimum necessary levels $1,756 -
MI0152 #08 Y:2007 Utilize energy-efficient belts and other improved mechanisms $894 $510
MI0152 #07 Y:2007 Use optimum size and capacity equipment $3,097 $3,010
MI0152 #06 Y:2007 Reduce the pressure of compressed air to the minimum required $4,557 $30
MI0152 #05 Y:2007 Reduce the pressure of compressed air to the minimum required $5,287 $30
MI0152 #04 Y:2007 Pay bills on time to avoid late fees $6,896 $300
MI0152 #03 Y:2007 Utilize controls to operate equipment only when needed $18,314 $4,000
MI0152 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $29,086 $724
MI0152 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $31,769 $1,074