1,308
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0058 #11 Y:2010 | 11 | 2010 | Install compressor air intakes in coolest locations | $1,215 | $2,500 | |
| DL0058 #10 Y:2010 | 10 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $2,110 | $18,280 | |
| DL0058 #09 Y:2010 | 09 | 2010 | Install adequate dryers on air lines to eliminate blowdown | $4,200 | $10,000 | |
| DL0058 #08 Y:2010 | 08 | 2010 | Utilize higher efficiency lamps and/or ballasts | $2,000 | $7,644 | |
| DL0058 #07 Y:2010 | 07 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,080 | $6,300 | |
| DL0058 #06 Y:2010 | 06 | 2010 | Lower temperature during the winter season and vice-versa | $10,400 | $100 | |
| DL0058 #05 Y:2010 | 05 | 2010 | Turn off equipment when not in use | $11,800 | $250 | |
| DL0058 #04 Y:2010 | 04 | 2010 | Disconnect ballasts | $12,500 | $350 | |
| DL0058 #03 Y:2010 | 03 | 2010 | Make a practice of turning off lights when not needed | $143,000 | $4,268 | |
| DL0058 #02 Y:2010 | 02 | 2010 | Install fossil fuel make-up air unit | $95,200 | $250,000 | |
| DL0058 #01 Y:2010 | 01 | 2010 | Reduce ventilation air | $152,300 | $500,000 | |
| UD0821 #11 Y:2010 | 11 | 2010 | Install outside air damper / economizer on hvac unit | $669 | $400 | |
| UD0821 #10 Y:2010 | 10 | 2010 | Reduce space conditioning during non-working hours | $1,772 | $3,500 | |
| UD0821 #09 Y:2010 | 09 | 2010 | Install fossil fuel make-up air unit | $2,560 | $5,542 | |
| UD0821 #08 Y:2010 | 08 | 2010 | Replace existing hvac unit with high efficiency model | $23,979 | $43,700 | |
| UD0821 #07 Y:2010 | 07 | 2010 | Reduce the pressure of compressed air to the minimum required | $2,766 | $25 | |
| UD0821 #06 Y:2010 | 06 | 2010 | Recover waste heat from equipment | $3,023 | $4,000 | |
| UD0821 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $479 | $893 | |
| UD0821 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $40,341 | $60,300 | |
| UD0821 #03 Y:2010 | 03 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $3,331 | $75 |