Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,308

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Medical equipment and supplies manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0457 #10 Y:2010 Install / repair insulation on steam lines $428 $579
IA0457 #09 Y:2010 Use most efficient type of electric motors $1,214 $2,400
IA0457 #08 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $2,163 $70
IA0457 #07 Y:2010 Recover waste heat from equipment $691 $752
IA0457 #06 Y:2010 Install compressor air intakes in coolest locations $525 $840
IA0457 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $871 $22
IA0457 #04 Y:2010 Reduce illumination to minimum necessary levels $13,609 $175
IA0457 #03 Y:2010 Install occupancy sensors $1,389 $1,210
IA0457 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $6,596 $995
IA0457 #01 Y:2010 Use photocell controls $112 $420
UF0436 #09 Y:2010 Develop a repair/replace policy $29,576 $10,400
UF0436 #08 Y:2010 Use separate switches on perimeter lighting which may be turned off when natural light is available $19,232 $26,795
UF0436 #07 Y:2010 Make a practice of turning off lights when not needed $811 $895
UF0436 #06 Y:2010 Install occupancy sensors $1,758 $524
UF0436 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,376 $1,782
UF0436 #04 Y:2010 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $13,947 $350
UF0436 #03 Y:2010 Preheat combustion air with waste heat $27,623 $20,280
UF0436 #02 Y:2010 Install turbulators $4,953 $7,500
UF0436 #01 Y:2010 Repair faulty insulation in furnaces, boilers, etc $493 $388
DL0058 #12 Y:2010 Utilize energy-efficient belts and other improved mechanisms $1,140 $5,050