Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,872

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0301 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $199 $86
UA0301 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $753 $3,317
UA0301 #07 Y:2025 Install occupancy sensors $3,160 $603
UA0301 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $8,289 $670
UA0301 #05 Y:2025 Recover waste heat from equipment $11,512 $21,363
UA0301 #04 Y:2025 Install timers and/or thermostats $371 $482
UA0301 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,981 $4,771
UA0301 #02 Y:2025 Replace existing hvac unit with high efficiency model $51,128 $122,356
UA0301 #01 Y:2025 Use solar heat to make electricty $129,998 $1,628,940
NT0052 #05 Y:2025 Lower light fixtures in high ceiling areas $400,000 $112,035
NT0052 #04 Y:2025 Purchase new equipment to reduce material use / cost $180,689 $135,000
NT0052 #03 Y:2025 Replace existing hvac unit with high efficiency model $110,740 $106,736
NT0052 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $6,191 -
NT0052 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,372 $5,609
MI0464 #06 Y:2025 Turn off equipment when not in use $1,948 $2,600
MI0464 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,193 $1,665
MI0464 #04 Y:2025 Air condition only space necessary $5,341 $960
MI0464 #03 Y:2025 Close holes and openings in building such as broken windows $5,173 $485
MI0464 #02 Y:2025 Utilize controls to operate equipment only when needed $3,243 -
MI0464 #01 Y:2025 Lower temperature during the winter season and vice-versa $2,522 -