Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

319

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Printed circuit assembly (electronic assembly) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0562 #12 Y:2024 Use solar heat to make electricty $36,470 $266,289
SU0562 #11 Y:2024 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $437 $2,900
SU0562 #10 Y:2024 Use solar heat to make electricty $291 $1,234
SU0562 #09 Y:2024 Insulate bare equipment $639 $2,272
SU0562 #08 Y:2024 Install an uninteruptable power supply $25,000 $80,000
SU0562 #07 Y:2024 Install compressor air intakes in coolest locations $419 $632
SU0562 #06 Y:2024 Install back-up equipment $75,000 $86,000
SU0562 #05 Y:2024 Recover waste heat from equipment $374 $418
SU0562 #04 Y:2024 Apply for tax-free status for energy purchases $3,064 $120
SU0562 #03 Y:2024 Eliminate or reduce compressed air usage $656 -
SU0562 #02 Y:2024 Reschedule plant operations or reduce load to avoid peaks $2,090 -
SU0562 #01 Y:2024 Disconnect ballasts $526 -
MU0056 #07 Y:2024 Use solar heat to make electricty $21,248 $158,400
MU0056 #06 Y:2024 Reduce illumination to minimum necessary levels $1,122 -
MU0056 #05 Y:2024 Insulate glazing, walls, ceilings, and roofs $120 $187
MU0056 #04 Y:2024 Use proper thickness of insulation on building envelope $502 $207
MU0056 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $8 -
MU0056 #02 Y:2024 Install compressor air intakes in coolest locations $601 $1,181
MU0056 #01 Y:2024 Recover heat from exhausted steam, hot air or hot water $42,634 $3,703
UC2411 #07 Y:2024 Install timers and/or thermostats $819 $3,620