387
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal heat treating | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0856 #11 Y:2012 | 11 | 2012 | Reduce ventilation air | $4,756 | $8,600 | |
| UD0856 #10 Y:2012 | 10 | 2012 | Replace electrically-operated equipment with fossil fuel equipment | $11,452 | $30,000 | |
| UD0856 #09 Y:2012 | 09 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $240 | $1,000 | |
| UD0856 #08 Y:2012 | 08 | 2012 | Reduce the pressure of compressed air to the minimum required | $782 | $50 | |
| UD0856 #07 Y:2012 | 07 | 2012 | Install compressor air intakes in coolest locations | $1,339 | $1,500 | |
| UD0856 #06 Y:2012 | 06 | 2012 | Eliminate or reduce compressed air usage | $1,802 | $700 | |
| UD0856 #05 Y:2012 | 05 | 2012 | Eliminate or reduce compressed air usage | $3,442 | $2,160 | |
| UD0856 #04 Y:2012 | 04 | 2012 | Size electric motors for peak operating efficiency | $6,690 | $5,370 | |
| UD0856 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $441 | $2,025 | |
| UD0856 #02 Y:2012 | 02 | 2012 | Install occupancy sensors | $720 | $300 | |
| UD0856 #01 Y:2012 | 01 | 2012 | Utilize higher efficiency lamps and/or ballasts | $6,482 | $8,415 | |
| UMS006 #05 Y:2012 | 05 | 2012 | Insulate bare equipment | $4,800 | $9,000 | |
| UMS006 #04 Y:2012 | 04 | 2012 | Use heat in flue gases to preheat products or materials | $6,500 | $5,000 | |
| UMS006 #03 Y:2012 | 03 | 2012 | Analyze flue gas for proper air/fuel ratio | $28,000 | $10,000 | |
| UMS006 #02 Y:2012 | 02 | 2012 | Use waste heat from hot flue gases to preheat | $105,000 | $210,000 | |
| UMS006 #01 Y:2012 | 01 | 2012 | Convert to oxyfuel burners | $710,000 | $550,000 | |
| BD0394 #07 Y:2011 | 07 | 2011 | Install occupancy sensors | $855 | $225 | |
| BD0394 #06 Y:2011 | 06 | 2011 | Install compressor air intakes in coolest locations | $1,201 | $400 | |
| BD0394 #05 Y:2011 | 05 | 2011 | Utilize higher efficiency lamps and/or ballasts | $2,201 | $1,652 | |
| BD0394 #04 Y:2011 | 04 | 2011 | Utilize higher efficiency lamps and/or ballasts | $3,571 | $2,360 |