2,058
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UW0033 #02 Y:2009 | 02 | 2009 | Distill contaminated solvents for reuse | $7,344 | - | |
| UW0033 #01 Y:2009 | 01 | 2009 | Turn off equipment when not in use | $9,132 | - | |
| WV0398 #17 Y:2009 | 17 | 2009 | Chill water to the highest temperature possible | $606 | $60 | |
| WV0398 #16 Y:2009 | 16 | 2009 | Utilize a less expensive cooling method | $1,732 | $1,075 | |
| WV0398 #15 Y:2009 | 15 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $2,030 | - | |
| WV0398 #14 Y:2009 | 14 | 2009 | Install compressor air intakes in coolest locations | $3,089 | $245 | |
| WV0398 #13 Y:2009 | 13 | 2009 | Eliminate or reduce compressed air usage | $3,767 | $75 | |
| WV0398 #12 Y:2009 | 12 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $3,839 | $3,121 | |
| WV0398 #11 Y:2009 | 11 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,235 | $419 | |
| WV0398 #10 Y:2009 | 10 | 2009 | Utilize higher efficiency lamps and/or ballasts | $5,120 | - | |
| WV0398 #09 Y:2009 | 09 | 2009 | Utilize higher efficiency lamps and/or ballasts | $5,891 | $900 | |
| WV0398 #08 Y:2009 | 08 | 2009 | Establish a preventative maintenance program | $10,882 | $1,000 | |
| WV0398 #07 Y:2009 | 07 | 2009 | Develop a repair/replace policy | $11,204 | $793 | |
| WV0398 #06 Y:2009 | 06 | 2009 | Use insulation in furnaces to facilitate heating / cooling | $11,848 | $3,759 | |
| WV0398 #05 Y:2009 | 05 | 2009 | Utilize higher efficiency lamps and/or ballasts | $17,098 | $44,783 | |
| WV0398 #04 Y:2009 | 04 | 2009 | Use waste heat from flue gases to heat space conditioning air | $75,243 | $72,000 | |
| WV0398 #03 Y:2009 | 03 | 2009 | Purchase new equipment to reduce material use / cost | $97,378 | $120,000 | |
| WV0398 #02 Y:2009 | 02 | 2009 | Replace existing equipment with more suitable substitutes | $165,791 | $85,600 | |
| WV0398 #01 Y:2009 | 01 | 2009 | Use waste heat from hot flue gases to preheat | $413,866 | $803,660 | |
| UM0358 #07 Y:2009 | 07 | 2009 | Insulate bare equipment | $5,125 | $11,770 |