Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Lime manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0133 #06 Y:2018 Install occupancy sensors $2,849 $1,155
UU0133 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $5,767 $5,679
UU0133 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $15,825 -
UU0133 #03 Y:2018 Use heat in flue gases to preheat products or materials $30,169 $97,680
UU0133 #02 Y:2018 Use power during off-peak periods $206,416 $1,600
UU0133 #01 Y:2018 Utilize controls to operate equipment only when needed $473,255 $175,000
AM0713 #05 Y:2016 Use / purchase optimum sized compressor $3,460 $3,900
AM0713 #04 Y:2016 Use synthetic lubricant $4,600 -
AM0713 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $5,870 $16,220
AM0713 #02 Y:2016 Optimize plant power factor $58,650 $76,000
AM0713 #01 Y:2016 Install waste heat boiler to provide direct power $453,910 $3,100,000
AM0664 #07 Y:2014 Install occupancy sensors $625 $870
AM0664 #06 Y:2014 Utilize energy-efficient belts and other improved mechanisms $4,970 $4,550
AM0664 #05 Y:2014 Provide proper maintenance of motor driven equipment $5,260 -
AM0664 #04 Y:2014 Install timers on light switches in little used areas $7,770 $1,200
AM0664 #03 Y:2014 Reduce the pressure of compressed air to the minimum required $7,750 $12
AM0664 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $17,030 $3,600
AM0664 #01 Y:2014 Optimize plant power factor $46,500 $51,870
IA0456 #08 Y:2010 Utilize energy-efficient belts and other improved mechanisms $12,524 -
IA0456 #07 Y:2010 Use most efficient type of electric motors $1,067 $2,774