Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ready-mix concrete manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0570 #06 Y:2024 Install back-up equipment $46,731 $90,000
LE0570 #05 Y:2024 Install compressor air intakes in coolest locations $4,252 $5,000
LE0570 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $25,168 $26,500
LE0570 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $55,246 $42,000
LE0570 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $33,515 $15,000
LE0570 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $9,292 -
UW2317 #05 Y:2023 Improve combustion control capability $30,104 $300,000
UW2317 #04 Y:2023 Change product design to reduce energy requirements $31,756 $1,000,000
UW2317 #03 Y:2023 Install storm windows and doors $156 $1,901
UW2317 #02 Y:2023 Improve air circulation with destratification fans / other methods $658 $1,096
UW2317 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $533 -
UW2315 #03 Y:2023 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $1,343 $10,879
UW2315 #02 Y:2023 Improve combustion control capability $30,104 $300,000
UW2315 #01 Y:2023 Improve air circulation with destratification fans / other methods $6,189 $1,896
WM0204 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $97 $240
WM0204 #04 Y:2023 Install occupancy sensors $571 $750
WM0204 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $651 $1,001
WM0204 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,440 $2,330
WM0204 #01 Y:2023 Meter recycled water (to reduce sewer charges) $22,875 $1,950
IC0283 #04 Y:2023 Install compressor air intakes in coolest locations $350 $840